Nottingham station

Nottingham station, briefly known as Nottingham City and for rather longer as Nottingham Midland, is a railway station and tram stop in the city of Nottingham. It is the principal railway station of Nottingham. It is also a nodal point on the city's tram system, with a tram stop that was originally called Station Street but is now known as Nottingham Station.

Nottingham
National Rail Nottingham Express Transit
Nottingham station main entrance after redevelopment
General information
LocationNottingham, City of Nottingham
England
Coordinates52.947°N 1.146°W / 52.947; -1.146
Grid referenceSK575392
Managed byEast Midlands Railway
Platforms9
(7 National Rail & 2 NET (tram))
Other information
Station codeNOT
ClassificationDfT category B
History
Original companyMidland Railway
Pre-groupingMidland Railway
Post-groupingLondon, Midland and Scottish Railway
Key dates
22 May 1848 (1848-05-22)Opened as Nottingham
16 January 1904New building opened
25 September 1950Renamed Nottingham City
18 June 1951Renamed Nottingham Midland
5 May 1969Renamed Nottingham
9 March 2004Station Street tram stop opened
2011–2014Redeveloped
27 July 2015Nottingham Station tram stop opened to replace Station Street
Passengers
2017/18Increase 7.805 million
2018/19Increase 8.005 million
 Interchange  0.522 million
2019/20Decrease 7.865 million
 Interchange Decrease 0.478 million
2020/21Decrease 1.417 million
 Interchange Decrease 0.105 million
2021/22Increase 5.202 million
 Interchange Increase 0.323 million
Listed Building – Grade II*
Designated12 July 1972
Reference no.Historic England listing reference 1271301
Notes
Passenger statistics from the Office of Rail and Road

The station was first built by the Midland Railway (MR) in 1848 and rebuilt by the same company in 1904, with much of the current building dating from the later date. It is now owned by Network Rail and managed by East Midlands Railway (EMR). Besides EMR trains, it is also served by CrossCountry and Northern trains and by Nottingham Express Transit (NET) trams.

The station was one of several that once served the city of Nottingham. Amongst these were the city centre stations of Nottingham Victoria on the Great Central Railway, and Nottingham London Road on the Great Northern Railway; both of these stations are now closed. A number of minor stations served localities outside the city centre, but the only such station to remain open within the city boundaries is Bulwell. On 12 January 2018, the newly renovated buildings of Nottingham station were badly damaged by fire.

History

Early beginnings

Nottingham's first station was Carrington Street station, which opened in May 1839, when the Midland Counties Railway opened the line from Nottingham to Derby. This terminus station was situated on the opposite side of Carrington Street from the current station, on a site now occupied by Nottingham Magistrates' Court. The original station gate posts still exist and form the pedestrian entrance to the Magistrates' Courts area.

The 1848 station

In 1844, the Midland Counties Railway merged with two others into the Midland Railway. By 1848, the new company had outgrown Carrington Street station and new lines to Lincoln had been opened. A new through station was opened on the current station site on 22 May 1848, replacing the Carrington Street station. George Hall of Derby was the architect, and J.C. Hall of Nottingham the contractor[1] and it had its entrance on Station Street. In 1869, the Midland Railway purchased the West Croft Canal arm, filling it and building additional parallel tracks to south.[2]

In the 1880s, Nottingham station employed 170 men. Although attractive when it first opened, by the early 20th century the station was cramped, with only three platforms.

On 18 August 1896, a light engine, running tender first, was passing through the station when it collided with six empty fish trucks. One of the trucks was thrown off the rails against a cast-iron column supporting the inner ends of the principals of the station roof and, when the column broke, a portion of the roof, measuring about 94 feet (29 m) by 56.5 feet (17.2 m), fell onto the platforms and track. Six people on the platform were injured.[3][4]

The 1904 station

Nottingham Midland Station, Nottingham

When the Great Central Railway opened its Nottingham Victoria Station in 1900, the Midland Railway appointed Albert Edward Lambert,[5] a local Nottingham architect, to rebuild the Midland station. Lambert had been the architect for Great Central's station and, consequently, the two buildings had many similarities in their design. The station was rebuilt largely on the same site as the Station Street station, but the entrance was relocated onto Carrington Street.[6]

The first contract for the station buildings was awarded to Edward Wood and Sons of Derby on 23 January 1903, who were also awarded the contract for the buildings on platforms 1 and 2 on 16 September 1903. The contract for the buildings on platforms 4 and 5 was awarded to Kirk, Knight & Co of Sleaford on 18 June 1903, who were also responsible for building the parcels office (Forward House) on Station Street, which opened in November 1903. The structural steelwork and cast-ironwork was done by Handyside & Co.[7] and the Phoenix Foundry, both of Derby.

The station was built in an Edwardian Baroque Revival style at a cost of £1 million (£114.2 million in 2021)[8] and was described by the Nottingham Evening News on the eve of its opening (16 January 1904) as a "magnificent new block of buildings". The building used a mix of red brick, terracotta (used as a substitute for building stone) and faience (a glazed terracotta), with slate and glazed pitch roofs over the principal buildings. The carriage entrances have Art Nouveau wrought-iron gates.[9]

The station's forebuildings were opened to passengers without any formal ceremony on 17 January 1904, although next day the Evening News reported that the platforms were still in a state of chaos and were not expected to be ready for another nine months. However, it did note that "the result promises to be the provision for Nottingham of one of the most commodious and most convenient passenger stations in the country". The day began with the closure of the booking offices in the old station, after the last tickets were issued for the 5:25 a.m. London train and the new booking offices were opened in time to issue tickets for the 6:25 a.m. Erewash Valley train. No attempt was made to exclude the public from the building and many took the opportunity to view the new station buildings. The Evening News commented on the public's admiration of the style and elegance of the station approaches and booking hall; it went on to describe the day's events.[10]

20th century

Detail of structural pillar showing the Handyside company logo.

The station became the property of the London, Midland and Scottish Railway, under the railway grouping of 1923. On Sunday 2 July 1939, the station was targeted by the Irish Republican Army[11] in an attack on eight stations in the Midlands under their S-Plan; the others being Leicester, Derby, Birmingham, Stoke, Coventry, Leamington Spa and Stafford. A bomb was left in a suitcase and exploded at 6:30 a.m. The glass roof of the cloak room and enquiry office was blown away.[12]

The station was nationalised in 1948, under the Transport Act 1947, becoming part of British Railways. Following the privatisation of the railways in the 1990s, ownership was transferred to Railtrack and subsequently to Network Rail.

For many years, the Midland Railway suffered the indignity of its rival, the Great Central Railway, crossing above the station on a 170-foot-long (52 m) bowstring girder bridge. This bridge became redundant in 1973 and was finally dismantled in the early 1980s.[13] The alignment was later used for a new tramway bridge.[14]:8

Station Street tram stop

The former Station Street tram stop, before the extension across the station towards the camera

With the opening of the Nottingham Express Transit (NET) in March 2004, Nottingham station became the southern terminus of the new tram line. The actual tram stop was located on Station Street, directly north of Nottingham railway station and partially over the Nottingham Canal. It was constructed on a separate right-of-way, built on top of part of the old Great Central Main Line viaduct that used to lead northwards to the separate Nottingham Victoria railway station. North of the former stop, the tram route diverged from the old railway route to join an on-street section through the centre of Nottingham. To the south, the route ended at the end of the viaduct, where a since demolished bridge used to carry the Great Central line over the station. In 2012, work started to extend Nottingham Express Transit south towards Toton Lane and Clifton South.[15]

The tram stop itself was substantial, with a small station building containing a waiting area housing steps and a lift to reach the street below. There was also a short footbridge over Station Street, which connected to the main railway station. Up to three trams could be accommodated on the two platform faces; the western platform had a single-length platform, while the eastern platform was an extended double-length platform.[15]

Redevelopment

Plans for a multi-million pound refurbishment and redevelopment of the station were unveiled by junior government minister Norman Baker on 5 October 2010.[16][17][18] Under the scheme, the station's porte-cochère was to be made vehicle-free and the station's Grade II* listed buildings restored. The redevelopment also included the construction of another platform, more shops and a bridge to carry Nottingham Express Transit trams over the top of the station.[14]:5,8[19]

Funding

The redevelopment was initially estimated to cost £67 million.[20][21] East Midlands Development Agency stated they would contribute £9.5 million to the project, but had to reduce this amount following government cuts.[17][22] In July 2009, the then Transport Minister, Sadiq Khan, gave conditional approval for the city council to use funds raised from their controversial Workplace Parking Levy to contribute to the redevelopment.[23]

The final funding was reorganised to be around £60 million, with Network Rail contributing £41 million, Nottingham City Council £14.8 million, EMDA £2.1 million, East Midlands Trains £1.6 million and the Railway Heritage Trust[24] £0.5 million.[17][19]

Station masterplan

In 2001, the architects Building Design Partnership (BDP) were appointed as the lead consultants,[25]:3[26][27][28] using the same team that had redeveloped Manchester Piccadilly based on an estimate of £550,000[25]:4 and in cooperation with Posford Rail, MVA, Jones Lang LaSalle and Bovis Lend Lease.[28]

  • Stage 1 of the Nottingham Station Masterplan cost £99,960[29] and was launched at Loxley House on 19 July 2002.[30]:4 The main stakeholders at the time were Nottingham City Council, Nottinghamshire County Council, Central Trains, Midland Mainline, Nottingham Development Enterprise, Nottingham Regeneration Limited and the EMDA, which together acted as the Nottingham Railway Station Steering Group.[30]:1–2
  • State 2a of the masterplan preparation was budgeted to cost £59,940.63 and also to be undertaken by BDP.[30]:5

BDP engaged Tuffin Ferraby Taylor to undertake surveys of all elements of the station dating from before 1918.[5] As well as an integrated NET tram station above platform 6,[14]:5 the masterplan included an additional concourse[31] and safeguarding for an additional platform.[14]:5

Car park

Between 2011 and 2012, a new multi-storey car park was constructed between platform 6 and Queen's Road, over the western half of the station's existing car park.[32] It was built by Vinci Construction[19] beginning in March 2011 and officially opened on 14 May 2012.[33]

The initial car park design had been put on hold in 2008, after being described as a "chicken coop".[34][35] The final design for the car park has 2,107 coloured metal sheets on the outside, formed of 2.1-millimetre-thick copper and stainless steel (1.5 mm stainless, 0.6 mm "Luvata" Copper).[35][36] These panels are affixed to the car park using 8,000 cleats fixed to pre-cast channels in the concrete structure.[36] The new car park building has five storeys[37] and space for 950 cars.[38]

Remodelling

Schemes costing £19 million (in 2007) and then £14 million (in 2008) were proposed.[39]:1 Remodelling and re-signalling costing £11.6 million were approved on 15 May 2009 by the Network Rail Investment Board[40] and took place as part of Control Period 4 (CP4), between 1 April 2009 and 31 March 2014.[41] Nottingham station was partially closed for ten weeks during 2013 for the track and signalling work.[42] During the blockade, the western end of the station was closed to trains for 37 days and the eastern end for 10 days.[43]

Platform 4 was split to create two platforms.[44][45] All four tracks at the western end were given bi-directional railway signalling, allowing a better choice of non-conflicting routes.[44] These lines are referred to as Line A, Line B, Line C and Line D.[46]:61 Although all lines are bi-directional, their use is segregated, with services towards Sheffield and Mansfield focused on the northern pair of tracks, and services to Derby and Leicester focused on the southern pair of tracks.[41][47]:140 Line speeds for trains arriving from Chesterfield and the Robin Hood Line were increased from 35 miles per hour (56 km/h) to 50 miles per hour (80 km/h).[44] On 7 March 2012, Network Rail requested formal "network change" acceptance from the train operating companies.[47][48]

Change in platform numbering and lengths after remodelling[46]:77
Platform number previous 123 456
Platform length Steady409Steady82Steady409 Steady373Steady372Steady285
Platform number post-2013 1234567
Platform length Decrease343Increase90Decrease296Decrease112Decrease150Decrease290Decrease268

On-site preparation works began in September 2011, with all new signal structures installed by June 2013 followed by the "Nottingham blockade"; this itself lasted from July 2013 until the handover in September 2013.[47]:141 The work was spread from Beeston, past Mansfield Junction, Nottingham West Junction and to Nottingham East Junction.[47]:140 The blockade covered renewing 5.9 kilometres (3.7 mi) of track and adding or renewing 14 sets of pointwork.[47]:140

Footbridge

The station as viewed from the car park to the south; the bridge carrying footpath 28 is mid-shot; beyond it work has just started on the new tram bridge

Halfway along the platforms is an overhead footbridge, running from Station Street (at the north) and the tram stop link over station platforms 1–5 to platform 6 and car parking facilities at Queen's Road (at the south).[14]:2 The footbridge carries footpath 28, the only traffic-free crossing over the Midland Main Line in Nottingham.[49]:4 Footpath 28 was previously diverted from the demolished footbridge 21 to the present footbridge 20B during the 1990s. The original route formed part of the Trent Bridge Footway,[49]:4 between the centre of Nottingham and the river crossing at Trent Bridge. In 2004, Nottingham City Council stated that right of way over the footbridge would be closed, following the completion of a multi-storey car park.[14]:4

Alternative pavement improvement works were scheduled for Queens Road in February 2009.[39]:2 During 2008–2012, BPR Architects submitted designs for automated ticket gate (ATG) barrier installations at St Pancras, Sheffield, Derby and Nottingham station concourses plus both ends of Nottingham footbridge 20B.[50]:2[51] BPR's design included four ATG barriers on the north end of the footbridge itself, plus a new enclosure and four barriers between the car park and platform 6 at the south end.[52][53] A procedure to permanently stop-up the right-of-way commenced on 19 March 2010,[49]:1 A planning application for barriers was filed on 29 March 2010 and withdrawn again on 10 May 2010.[54] Following a public inquiry held during 8–9 November 2011, the stopping up order was denied; the inspector summing up:[49]:8[55][56]

Footpath 28 is unique and offers an experience which the alternative, replacement route cannot – a traffic free route within the city, which in addition provides a convenient link for a large number of users to and from residential areas, work places and other facilities. It provides a short but valued opportunity for pedestrians to get away from trafficked routes, with the added amenity value of an historic environment. On balancing the merits and demerits of the stopping up order, I find that the disadvantages and loss likely to arise as a result of the stopping up of the footpath to members of the public generally are such that permanent closure of Footpath 28 to the public is not justified. Thus, I conclude that the Order should not be confirmed.

Susan Doran BA Hons MIPROW, Inspector appointed by the Secretary of State for Environment, Food and Rural Affairs, Decision Notice §44, 13 December 2011[49]:8

The footbridge was scheduled to be closed temporarily in November 2017; the reasons given were "making improvements" and "essential maintenance work".[57][58]

New bridge and tram stop

To facilitate the Nottingham Express Transit's phase two extension into the south of the city, it was decided to have the tram line cross the station on the line of the original Great Central Railway viaduct, which had been closed to passenger trains in 1967 and goods in 1973. This required a bridge, crossing from the existing Station Street stop, which closed, over both the station and Queen's Road.[14]:5,8[59][60]

Construction of the tram bridge started on 10 April 2012 and the bridge was jacked into place in May 2013. The tram bridge design is a Warren truss design made of 508 to 711 mm (20.0 to 28.0 in) diameter steel tubes.[61]:6 The main bridge is 14.53 m (47.7 ft) wide between the truss centrelines, with two equal spans of 52.12 m (171.0 ft). The bridge is officially called the Karlsruhe Friendship Bridge, after Nottingham's twin city of Karlsruhe, Germany.[61]:6[62][63][64]

The new Nottingham Station tram stop was constructed on the bridge, providing interchange with the railway network. It replaced the previous Station Street tram stop, opened in 2004, which was located approximately 100 m (330 ft) to the north. The new stop was opened on 27 July 2015 and the former stop closed at the same time, although the intention is to reopen the Station Street access building as a second access to the new stop once it has been refurbished. The new stop served as the new southern terminus of the system until the rest of NET's phase two opened, at which point it became a through station, with trams continuing to new termini in Chilwell and Clifton.[15][65][66]

2018 fire

On the morning of 12 January 2018, a fire extensively damaged the station buildings. Nottinghamshire Fire and Rescue Service received a call at 6:25 am reporting that a fire had started in the women's toilet in the newly built section of the station.[67] The fire was attended by ten fire engines and 50 firefighters. Firefighters from Derbyshire Fire and Rescue Service also attended, bringing the total to 60.[68]

After the fire began, it spread upwards into the roof of the newly built section of the station, along the station concourse and into the historic station building.[69][70] There was extensive disruption to trains in the East Midlands area.

British Transport Police stated, later the same day, that they were treating the fire as arson[71] and, on 2 February 2018, police reported that a 33-year-old woman had been arrested on suspicion of arson.[72] In August 2019, a 34-year-old drug addict received a two-year jail sentence, having admitted to accidentally setting fire to a bin while using heroin and crack.[73]

In February 2018, East Midlands Trains named one of their recently transferred Class 43 power cars (43467) 'Nottinghamshire Fire and Rescue Service and British Transport Police Nottingham' after their assistance during the fire.[74]

Layout and facilities

Layout

The concourse in the old porte-cochère

The station is aligned approximately east to west, at the southern edge of the city centre, with Station Street to the north and Queen's Road to the south. At the western end of the station, the tracks are spanned by Carrington Street and the station's main entrance is on the eastern side of this street. Since the station's redevelopment, the entrances from Carrington Street open into a concourse that spans the station from north to south. This occupies what was once the station's porte-cochère and provides a large pedestrian circulation area, along with several retail sites.[14]:3–5[75]

The ticket hall for the railway station opens off the centre of eastern side of the concourse and, in turn, gives access via ticket barriers to a pedestrian overbridge with stairs and lifts down to the railway platforms. A second concourse opens off the main concourse at the southern end of its eastern side; this runs parallel and to the south of the platforms, giving access by stairs, lifts and escalators to the tram stop, the station car park, taxi rank, vehicular pick-up and drop-off points, and Queen Street. The tram stop spans the station from north to south to the east of the main entrance, at a higher level than the concourse, and east of that a second footbridge links the platforms; it carries the previously referred-to footpath 28.[14]:3–5[75]

The station's multi-storey car park lies south of the platforms, north of Queen Street, and east of the tram bridge. It provides parking for about 800 cars and the covered area below it houses the station's new taxi rank, pick-up and drop-off points, relocated from the old porte-cochère.[14]:3–5[75]

Railway platforms

Platform 7 looking across to platform 6 (with train) and up to the concourse

The railway platforms lie at a lower level than the station entrance and are within a ticket barrier enforced paid area. From north to south, the station has two island platforms and a single side platform, with a total of seven numbered platform faces.[76] Each platform is linked to the main entrance concourse by stairs and lifts and to the second footbridge by stairs only.[75]

The northern of the two island platforms has a bi-directionally signalled through platform face on each side, numbered 1 and 3, and an east-facing bay, numbered 2. The two through platforms are long enough to accommodate fifteen and fourteen coach trains, whilst the bay can accommodate a four-coach train.[76]

The middle island platform also has bi-directionally signalled through platform faces on each side, numbered 4 and 6, together with a west-facing terminal platform face, numbered 5. Platform 4 can accommodate a five-coach train, platform 5 a seven-coach train and platform 6 a fourteen-coach train.[76]

Finally the southern side platform is numbered 7 and can accommodate a thirteen-coach train. Sufficient space exists to the south of this platform to add a second platform face, effectively converting this side platform into an island platform, if traffic increases to justify it.[14]:7[76]

Tram stop

Nottingham Station
Nottingham Express Transit tram stop
General information
LocationNottingham, City of Nottingham
England
Coordinates52°56′49″N 1°08′44″W
Owned byNottingham Express Transit
Operated byNottingham Express Transit
Line(s) 1   2 
Platforms2
Tracks2
Construction
Structure typeViaduct
AccessibleStep-free access to platform
Key dates
9 March 2004Opened as Station Street
27 July 2015Resited and renamed Nottingham Station
Services
Preceding station NET Following station
Lace Market
towards Hucknall
Line 1 Meadows Way West
towards Toton Lane
Lace Market
towards Phoenix Park
Line 2 Queens Walk
Location
Nottingham Station is located in Nottinghamshire
Nottingham Station
Nottingham Station
Location in Nottinghamshire, England

The new tram stop is positioned at a higher level than the station entrance and lies at a right angle to, and above, the railway platforms. It is designed as a through stop, with two side platforms flanking each side of the double tramway track. Like all NET stops, pedestrian access between the platforms is permitted on the level via crossings at each end of the platforms. Ticket machines are located on both platforms and the stop lies outside the ticket barrier-enforced paid area of the railway station.[65]

The tram stop is connected directly to the railway station's main concourse (and the railway platforms) via the new side concourse, with stairs, escalators and lifts bridging the height difference. A direct access is also provided to the station's multi-storey car park. The former access from Station Street is also still available, accessible via a walkway running parallel to the railway tracks.[65]

North of the stop, the tramway tracks pass over Station Street and through the abandoned platforms of the former Station Street stop, before proceeding along the old Great Central Main Line viaduct and eventually joining an on-street section through the centre of Nottingham. South of the new stop, the tracks pass over Queen's Road before descending a ramp and re-joining the city's streets at ground level. The junction between the Clifton and Chilwell branches of the NET system lies just beyond this point.[77]

Services

National Rail services

Off-peak services (trains per hour) Monday-Friday as of the December 2021 timetable:

Preceding station   National Rail National Rail   Following station
CrossCountryTerminus
CrossCountry
CrossCountry
East Midlands Railway
Midland Main Line
Terminus
Limited Service
East Midlands Railway
Leicester–Lincoln/Grimsby/Cleethorpes
Limited Service
Limited Service
East Midlands Railway
Liverpool–Norwich
Limited Service
TerminusEast Midlands Railway
Nottingham–Skegness
Limited Service
Limited Service
East Midlands Railway
Robin Hood Line
Terminus
East Midlands Railway
Crewe-Newark Castle
Northern Trains
Leeds-Nottingham
Terminus

Nottingham Express Transit services

Nottingham station is on the common section of the NET, where line 1, between Hucknall and Toton Lane, and line 2, between Phoenix Park and Clifton South, operate together. The two branches to Toton Lane and Clifton South split to the south of the station, while sharing track to the north into the city centre. Trams on each line run at a frequency of between four and eight trams per hour, depending on the day and time of day, combining to provide up to 16 trams per hour on the common section.[77]

Preceding station NET Following station
Lace Market
towards Hucknall
Line 1 Meadows Way West
towards Toton Lane
Lace Market
towards Phoenix Park
Line 2 Queens Walk

See also

References

  1. "The New Station". Nottingham Review. England. 26 May 1848. Retrieved 22 October 2022 via British Newspaper Archive.
  2. Development Control Committee (23 April 2008). Historic Development and Archaeology. Station Conservation Area Character Appraisal and Management Plan (Report). Nottingham City Council. p. 8. Archived from the original on 3 September 2015. Retrieved 28 May 2012.
  3. Maj. F. A. Marindin (6 September 1896). Accident at Nottingham on 18th August 1896. Return of Accidents reported to Board of Trade by Railway Companies in United Kingdom, 1896 (with Reports of Inspecting Officers) (Report). Board of Trade (published 18 September 1896). pp. 149–152. Retrieved 27 August 2019.
  4. "The Accident at Nottingham Station". Evening Standard. London. 14 October 1896. Retrieved 27 July 2016 via British Newspaper Archive.
  5. Tuffin Ferraby Taylor (2 April 2008). Johnstone, Rachael (ed.). "Nottingham Railway Station" (PDF). Featured Projects. Retrieved 27 May 2012. AE Lambert built the station between 1903 and 1904 for Midland Railway Company.
  6. The Railway Gazette Volume 37. University of Chicago: Queen Anne's Chambers. 1922. p. 743.
  7. Jill Armitage (11 August 2014). Derby: A History. Amberley Publishing. ISBN 978-1445634777.
  8. UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 11 June 2022.
  9. "New Midland Station Nottingham". Nottingham Evening Post. England. 16 January 1904. Retrieved 1 March 2016 via British Newspaper Archive.
  10. "Opening of the New Nottingham Midland Station". Nottingham Evening Post. England. 18 January 1904. Retrieved 1 March 2016 via British Newspaper Archive.
  11. McKenna, J. (2016). The IRA Bombing Campaign Against Britain, 1939Ð1940. McFarland, Incorporated Publishers. p. 138. ISBN 9781476623726. Retrieved 17 February 2017.
  12. "Bomb Exposions in Nottingham, Leicester and Derby Stations". Nottingham Journal. England. 3 July 1939. Retrieved 31 July 2018 via British Newspaper Archive.
  13. Nigel Tout. "Old Photographs: Nottingham Demolition". gcrleicester.info. Retrieved 1 August 2020.
  14. Wood, Richard, ed. (27 July 2004). "Brief Description of Station Site". Nottingham Station Development Brief. Nottingham City Council. Archived from the original on 10 March 2013. Retrieved 27 May 2012.
  15. "Station Street tram stop". The Trams.co.uk. Archived from the original on 26 August 2015. Retrieved 5 August 2015.
  16. Cook, Ben (5 October 2010). "Nottingham unveils station revamp plans". Regeneration & Renewal. Haymarket. Retrieved 28 May 2012.
  17. "Transport Minister announces go-ahead for £60m station revamp". Nottingham Evening Post. 4 October 2010. Archived from the original on 5 May 2013. Retrieved 28 May 2012.
  18. Nottingham City Council (4 October 2010). "Norman Baker, Under-Secretary of State for Transport, announces redevelopment of Nottingham station" (video). Archived from the original on 12 December 2021. Retrieved 28 May 2012 via YouTube.
  19. Morby, Aaron (11 August 2011). "Vinci in talks to build £60m Nottingham station". Construction Enquirer. Retrieved 28 May 2012.
  20. "Nottingham Station". Archived from the original on 29 October 2002.
  21. "Nottingham Station" (PDF). Transport by BDP. Building Design Partnership. 1 May 2012. p. 20. Archived from the original (PDF) on 25 April 2012. Retrieved 27 May 2012.
  22. Robinson, Jon (18 January 2010). "Fly through £67m station revamp deal is 'close'". Nottingham Evening post. Archived from the original on 22 March 2013.
  23. "Nottingham tram extension funding approved". Railway Gazette. 31 July 2009. Retrieved 28 May 2012.
    Nottingham City Council (31 July 2009). "NET Phase Two & Workplace Parking Levy go ahead" (video). Archived from the original on 12 December 2021. Retrieved 28 May 2012 via YouTube.
  24. Railway Heritage Trust
  25. Horne, Barry; Regeneration and Renewal Panel (11 October 2004). Wood, Richard (ed.). Nottingham Station Master Plan. Report of the Duty Chief Executive (Report). Nottingham City Council. Archived from the original on 9 January 2016. Retrieved 27 May 2012.
  26. Lumley, Keith, ed. (9 August 2010). "Station Transformation Moves a Step Closer". Press Releases. Network Rail. Archived from the original on 7 September 2012. Retrieved 27 May 2012. BDP … the Manchester studio has been involved in the redevelopment of Nottingham and Chester stations
  27. "BDP Appointed for Retail Element of Birmingham's New Street Station". News. Building Design Partnership. 15 February 2008. Archived from the original on 13 April 2014. Retrieved 27 May 2012.
  28. "Building Design Partnership – Nottingham Rail Station". Property Mall. 17 October 2001. Archived from the original on 8 December 2007. Retrieved 27 May 2012.
  29. Jones, Adrian, ed. (14 February 2002). "Nottingham Station Masterplan". Report of the Director of Development and Environmental Services. Nottingham City Council. Archived from the original on 18 January 2016. Retrieved 27 May 2012.
  30. Planning and Transportation Policy Development and Review Committee (12 September 2002). Wood, Richard (ed.). Nottingham Station Masterplan. Report of the Director of Development and Environmental Services (Report). Nottingham City Council. Archived from the original on 29 August 2004. Retrieved 27 May 2012. {{cite report}}: |author= has generic name (help)
  31. Langston, Christopher (2 March 2009). "The path to Crossrail". Railway Strategies. Schofield Publishing (242). Retrieved 27 May 2012.
  32. Samuel, A. (7 March 2011). "Improvements at Nottingham station begin". Rail.co. Archived from the original on 16 January 2013. Retrieved 27 May 2012.
  33. "Train station car park opens". Nottingham Evening Post. 15 May 2012. Archived from the original on 19 May 2012. Retrieved 27 May 2012.
  34. "Station car park plan put on hold". BBC News Online. 20 August 2008. Retrieved 28 May 2012.
  35. "Station car park plan moves ahead". BBC News Online. 19 December 2008. Retrieved 28 May 2012.
  36. Specialist Cladding Systems (26 April 2012). "All Change as Contemporary Car Park Façade Transforms Nottingham Station". Archived from the original on 13 February 2013. Retrieved 27 May 2012.
  37. "Train station car park opens". Nottingham Evening Post. 15 May 2012. Archived from the original on 19 May 2012. Retrieved 28 May 2012.
  38. "Work starts on new Nottingham Railway Station car park". BBC News Online. 4 March 2011. Retrieved 28 May 2012.
  39. Joint Officer Steering Group (24 October 2008). Bamford, Jim; Carter, Chris (eds.). Rail Issues Update (PDF). Joint Committee on Strategic Planning & Transport (Report). Nottingham City Council; Nottingham County Council. Retrieved 29 May 2012.
  40. Joint Officer Steering Group (17 July 2009). Bamford, Jim; Carter, Chris (eds.). "Nottingham station resignalling scheme enhancements". Joint Committee on Strategic Planning & Transport. Nottingham City Council; Nottingham County Council. Archived from the original on 9 January 2016. Retrieved 28 May 2012.
  41. "A New Start for Rail Passengers and Freight in the East Midlands". networkrailmediacentre.co.uk. 31 March 2009. Archived from the original on 11 October 2020. Retrieved 11 October 2020. Signalling renewals at Nottingham station … segregation of trains at the west end of Nottingham with bi-directionally paired tracks for trains to Derby / Leicester and Mansfield / Sheffield
  42. "Some of Passenger Focus's recent successes". Making a difference for all passengers. Passenger Focus. 13 February 2012. Archived from the original on 15 April 2012. Retrieved 28 May 2012.
  43. Dangerfield, Guy (9 November 2011). Hewitson, Mike (ed.). Service disruption caused by engineering work (PDF). Board Meeting Paper (Report). Passenger Focus. pp. 1–2. Archived from the original (PDF) on 3 December 2014. Retrieved 28 May 2012.
  44. "Designs approved for 'biggest city rail upgrade in over 100 years'". Nottingham Evening Post. 18 July 2009. Archived from the original on 5 May 2013. Retrieved 28 May 2012.
  45. "Go-ahead for £60m Nottingham railway station revamp". BBC News Online. 4 October 2010. Retrieved 27 May 2012.
  46. Operational Planning Project Manager (13 April 2012). "East Midlands" (PDF). Timetable Planning Rules. Network Rail. p. 61,77. Retrieved 27 May 2012.
  47. Programme – Nottingham resignalling (PDF). Network Rail CP4 Delivery Plan 2010 Enhancements programme: statement of scope, outputs and milestones (Report). Network Rail. 29 June 2010. pp. 140–141. Archived from the original (PDF) on 1 January 2016. Retrieved 28 May 2012.
  48. "Proposed G1 Network Change: Nottingham Station Area Signalling Renewals – Amendment" (letter). Network Rail. 7 March 2012. Retrieved 28 May 2012.
    "NC G1 2010 LNE 012A Nottingham Station Area Signalling Renewal – Amendment". Network Rail. 28 May 2012. Archived from the original (directory) on 4 March 2016. Retrieved 14 July 2022.
  49. Doran, Susan (13 December 2011). Order Decision (PDF). Nottingham City Council (Nottingham Midland Station Footpath No.28) Stopping Up Order 2010 SUO 5015 (Report). The Planning Inspectorate. Archived from the original (PDF) on 1 June 2012. Retrieved 27 May 2012.
    "City of Nottingham Council". Online Rights of Way C. The Planning Inspectorate. 13 December 2011. Retrieved 28 May 2012.
  50. BPR Architects. "Document Issues Sheet" (Schedule). East Midlands ATG Enabling Works (EMT). p. 2.
  51. "Fare-dodge crackdown at train station". Nottingham Evening Post. 26 January 2009. Archived from the original on 5 May 2013. Retrieved 27 May 2012.
  52. "10/00885/LLIS1". 10 May 2010. Archived from the original on 23 December 2012. Retrieved 26 May 2012. Installation of automatic ticket gates on footbridge and erection of entrance enclosure to house automatic ticket gates to south of footbridge with associated CCTV cameras.
  53. NWW (24 February 2010). PBP (ed.). "Proposed Entrance Enclosure General Arrangement" (drawing). Nottingham City Council. drawing 0847-01/53. Retrieved 27 May 2012.
  54. "Withdrawal of Planning Proposal" (PDF). Listed Building Consent. Installation of automatic ticket gates on footbridge and erection of entrance enclosure to house automatic ticket gates to south of footbridge with associated CCTV cameras. … In accordance with your request, I am treating the above application as withdrawn.
  55. "Ramblers jubilant over saved station path". Press release archive. The Ramblers. 15 December 2011. Archived from the original (press release) on 23 July 2012. Retrieved 28 May 2012.
  56. "Historic footpath saved by walkers". Nottingham Evening Post. 16 December 2011. Archived from the original on 22 March 2013. Retrieved 28 May 2012.
  57. "We are making improvements to the Footbridge at Nottingham Station". East Midlands Trains. 6 November 2017. Archived from the original on 8 November 2017. Retrieved 8 November 2017. From Monday 20th November until Friday 24th November, the middle footbridge will be closed off while essential maintenance work takes place … to cross between the platforms, access the tram stop or reach Station Street will need to use the main station stairs at the end of the platforms.
  58. Barlow, Jamie (13 November 2017). "Footbridge at Nottingham Train Station to close for five days". Nottingham Evening Post. Retrieved 29 November 2017. footbridge will be closed from November 20 to November 24
  59. Clark, Paul (7 January 2007). Kay, Anthony (ed.). "NET Forward" (PDF). Railwatch. Railfuture. p. 16. Archived from the original (PDF) on 24 September 2015. Retrieved 28 May 2012. exactly on the same alignment as the old Great Central Bridge closed in the early 1970s!
  60. Barker, Robert M; Novitzky, Alan (15 August 2008). "The Routes – Common Section". Report to the Secretary of State for Transport and the Secretary of State for Communities and Local Government. The Nottingham Express Transit System Order Application for Deemed Planning Permission Applications for Listed Building and Conservation Area Constent (Report). The Planning Inspectorate. p. 14. Archived from the original on 13 April 2014. Retrieved 28 May 2012. route would pass over the railway station on new viaduct, on the line of the former Great Central Railway
  61. Duguid, Brian (15 March 2010). Nottingham Station Bridge, UK (PDF). 34th International Symposium on Bridge and Structural Engineering. Venice: Mott MacDonald. Archived from the original (PDF) on 15 April 2014. Retrieved 27 May 2012.
  62. Samuel, A. (10 May 2012). "New Nottingham tram design unveiled". Rail.co. Archived from the original on 23 November 2012. Retrieved 28 May 2012.
  63. "Extending NET over Nottingham Station". NET Phase Two. Nottingham City Council. 10 April 2012. Archived from the original on 5 August 2012. Retrieved 27 May 2012.
  64. "Nottingham tram bridge 'inched' into position". BBC. 17 May 2013. Archived from the original on 8 June 2013. Retrieved 6 August 2015.
  65. "New tram stop for station". Nottingham Express Transit. Archived from the original on 21 September 2015. Retrieved 5 August 2015.
  66. "Nottingham Express Transit Phase 2 opens". Railway Gazette. DVV Media UK Ltd. 25 August 2015. Archived from the original on 10 September 2015. Retrieved 25 August 2015.
  67. Toulson, Gemma (12 January 2018). "What we know so far about the large fire at Nottingham Station" (07:48 AM). Nottingham Evening Post. Retrieved 12 January 2018. Nottinghamshire Fire and Rescue Service was called at 6.25am to reports of a fire in the ladies toilet on a platform
  68. Nottinghamshire Fire and Rescue Service [@nottsfire] (12 January 2018). "There are now 10 fire engines in attendance approximately 50 fire fighters fighting the fire at the #NottinghamTrainStation" (Tweet). Retrieved 12 January 2018 via Twitter.
  69. Breese, Christ (12 January 2018). "Serious fire closes Nottingham Station and disrupts travel services across the city". Notts TV. Retrieved 12 January 2018. Bryn Coleman, incident commander for Nottinghamshire Fire and Rescue Service, told BBC Breakfast: "Crews arrived at approximately 6.30am to a significant fire in the new section of the train station. There was a fire in the concourse area and crews reported a severe fire in some of the blocks there. Unfortunately, the fire is spreading to the roof void of the new section of the train station and it's now travelling across the main concourse area across the main lines into Nottingham train station."
  70. "Nottingham train station closed as major fire brought under control". Nottingham Evening Post. 12 January 2018. Retrieved 12 January 2018.
  71. "BTP – Update: Fire at Nottingham railway station being treated as arson". media.btp.police.uk. Archived from the original on 19 March 2018. Retrieved 14 March 2018.
  72. "Woman held on suspicion of arson after huge fire at Nottingham train station". Sky News. 2 February 2018. Retrieved 14 March 2018.
  73. "Gemma Peat jailed for 25 months over Nottingham station fire". Sky News. 13 August 2019.
  74. "Special train naming recognises valuable support of emergency services during Nottingham station fire". 6 February 2018. Archived from the original on 27 March 2018. Retrieved 26 March 2018.
  75. "Nottingham Station Plan". National Rail Enquiries. Train Information Services Limited. Retrieved 3 September 2015.
  76. Yonge, John; Padgett, David; Szwenk, John (August 2013) [1990]. Bridge, Mike (ed.). Railway Track Diagrams 4: Midlands & North West (3rd ed.). Bradford on Avon: Trackmaps. map 6A. ISBN 978-0-9549866-7-4.
  77. "Extending your Tram Service" (PDF). Nottingham Express Transit. Archived (PDF) from the original on 7 August 2015. Retrieved 18 August 2015.
  78. GB eNRT December 2021 Edition, Table 52
  79. GB eNRT December 2021 Edition, Table 53
  80. GB eNRT December 2021 Edition, Table 54
  81. GB eNRT December 2021 Edition, Table 55
  82. GB eNRT December 2021 Edition, Table 58
  83. GB eNRT December 2021 Edition, Table 52
  84. GB eNRT December 2021 Edition, Table 57
  85. GB eNRT December 2021 Edition, Table 56
  86. GB eNRT December 2021 Edition, Table 53
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.