Hurst Green railway station
Hurst Green railway station is on the Oxted line in southern England and serves the Hurst Green neighbourhood of Oxted in Surrey. It is 21 miles 20 chains (21.25 miles, 34.20 km) from London Bridge. The station is managed by Southern.
Hurst Green | |
---|---|
General information | |
Location | Hurst Green, District of Tandridge England |
Grid reference | TQ399513 |
Managed by | Southern |
Platforms | 2 |
Other information | |
Station code | HUR |
Classification | DfT category E |
Key dates | |
1 June 1907 | Opened (Hurst Green Halt) |
12 June 1961 | New station opened to replace Halt |
Passengers | |
2017/18 | 0.662 million |
Interchange | 0.102 million |
2018/19 | 0.694 million |
Interchange | 72,609 |
2019/20 | 0.682 million |
Interchange | 70,091 |
2020/21 | 0.144 million |
Interchange | 10,486 |
2021/22 | 0.374 million |
Interchange | 30,010 |
Notes | |
Passenger statistics from the Office of Rail and Road |
History
The original Hurst Green Halt opened 1 June 1907 with short wooden platforms, sited between the road bridge and the junction of the East Grinstead/Uckfield lines. This halt was closed on 12 June 1961 and the present station was opened on the northside of the bridge.
Facilities
On the London-bound platform is a staffed ticket office (open during most of the day) and a self-service passenger-operated ticket machine is located outside the station on the London-bound side.
Services
Off-peak, all services at Hurst Green are operated by Southern using Class 171 DMUs and Class 377 EMUs.
The typical off-peak service in trains per hour is:[1]
- 1 tph to London Victoria (stopping)
- 1 tph to London Bridge (runs non-stop between Oxted and East Croydon)
- 1 tph to East Grinstead
- 1 tph to Uckfield
During the peak hours and on weekends, the service between London Victoria and East Grinstead is increased to 2 tph.
In addition, there are also a number of peak hour Thameslink operated services between East Grinstead, London Bridge and Bedford, which are operated using Class 700 EMUs.
On Sundays, northbound services on the Uckfield branch terminate at Oxted instead of London Bridge.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Southern East Grinstead Branch | ||||
Thameslink Peak Hours Only | ||||
Southern Uckfield Branch |
References
- Table 182 National Rail timetable, May 2022
External links
- Train times and station information for Hurst Green railway station from National Rail