The Hedberg

The Hedberg is performing arts campus and teaching facility that encompasses the historic Theatre Royal and the University of Tasmania (UTAS) through a collaborative partnership which also included the Australian and Tasmanian Governments.[1]

The Hedberg
TypePublic
Established9 August 2021 (9 August 2021)
Vice-ChancellorRufus Black[1]
Location
Hobart
, ,
42.879699°S 147.331447°E / -42.879699; 147.331447
NicknameThe Hedberg
AffiliationsUniversity of Tasmania
Websitehedberg.com.au

History

UTAS acquired the 1926 Hedberg Brothers mechanics warehouse building and carpark on the corner of Campbell and Collins Streets, adjoining the Theatre Royal. In 2007, the Theatre Royal and UTAS approached the Tasmanian Government for funding a joint venture in the creation of a world-class performance precinct.[2] Hobart’s Liminal Architecture team, as principal consultant, designed the building in collaboration with Singaporean architectural firm WOHA commencing in 2013.[3][4] Archaeological work was completed in 2018 with consultation from the Tasmanian Heritage Council.[1]

Built at a cost of $110m, the six-storey Hedberg building was officially opened by the Minister for the Arts, the Hon Elise Archer MP on 9 August 2021.[5]

Theatre Royal

Facilities

Name Use Capacity Notes
Claudio Alcorso FoyerSocial SpaceA socialising space honouring Italian-born entrepreneur and environmentalist Claudio Alcorso, who aided the development of the Tasmanian Centre for the Arts at Sullivans Cove.
Vanessa Goodwin City RoomCreative SpaceRooftop terrace providing spaces for creative collaboration and small-scale corporate events. Named for Vanessa Goodwin, the former Attorney-General of Tasmania and UTAS alumni.
Ian Potter Recital HallAuditorium289 seatsAcknowledges Australian philanthropist Ian Potter. Hosts a 289 seat auditorium, specifically tuned sonic and equipped with live-streaming technology for a wide range of performances.
The SalonAuditorium150 seatsThe Salon is a performing space and recording studio constructed within the original Hedberg garage.
Theatre RoyalAuditorium698 seatsThe original 1837 Theatre Royal auditorium.

Awards

Tasmanian Architecture Awards[6][7]

  • Tasmanian Architecture Medal (2022)
  • Alan C Walker Award for Public Architecture (2022)
  • Dirk Bolt Award for Urban Design (2022)
  • Roy Sharrington Smith Award for Heritage (2022)
  • COLORBOND Award for Steel Architecture (2022)
  • Alexander North Award for Interior Architecture (2022)

See also

References

  1. Ducker, Amanda (2 April 2020). "The $110m Hedburg arts centre is underway". The Mercury. Retrieved 18 June 2022.
  2. Norrie, Helen (25 May 2021). "Embedded narratives: The Hedberg". architectureau.com. Retrieved 18 June 2022.
  3. Wu, Daven (17 January 2022). "Tasmania's The Hedberg bridges old and new through culture and architecture". wallpaper.com. Retrieved 18 June 2022.
  4. Astbury, Jon (16 February 2022). "The Hedberg: a theatre that shines like an abalone shell". dezeen.com. Retrieved 18 June 2022.
  5. "Performance, partnership and giving at the heart of Hedberg". University of Tasmania. 8 September 2021. Retrieved 18 June 2022.
  6. "2022 Tasmanian Architecture Awards". architectureau.com. 11 June 2022. Retrieved 2 July 2022.
  7. "Excellence on show at Tasmanian Architecture Awards". buildaustralia.com.au. 14 June 2022. Retrieved 2 July 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.