Russian corvette MPK-219
The MPK-219 was a Parchim-class corvette in the Soviet Navy and later Russian Navy.
History | |
---|---|
Russia | |
Name | MPK-219 |
Builder | Peene-Werft, Wolgast |
Yard number | 380 |
Laid down | 7 November 1986 |
Launched | 30 September 1987 |
Commissioned | 23 December 1988 |
Decommissioned | 10 April 2002 |
Identification | See Pennant numbers |
Fate | Scrapped |
General characteristics | |
Class and type | Parchim-class corvette |
Displacement | |
Length | 72 m (236 ft 3 in) |
Beam | 9.40 m (30 ft 10 in) |
Draught | 4.60 m (15 ft 1 in) |
Installed power | 14,250 hp (10,630 kW) |
Propulsion | 3 shaft M504 diesel engines |
Speed | 24.7 knots (45.7 km/h) |
Range | 2,100 nmi (3,900 km) at 14 knots (26 km/h; 16 mph) |
Complement | 80 |
Sensors and processing systems |
|
Armament |
Specifications
Developed in the GDR by specialists from the Zelenodolsk shipyard, Captain 2nd Rank O.K. Korobkov was appointed the main observer from the Navy on the project. For the GDR Navy, 16 ships were built (in Germany, Project 133.1, Parchim), the head MPK entered service in 1981. In 1992, all ships of the Project 133.1 were sold to Indonesia. For the USSR Navy, they were built according to the 1331M Project, after the collapse of the USSR, all ships were transferred to the Russian Navy. The modernized version was distinguished by updated artillery, hydroacoustic and radio-technical weapons.[1]
Project 133.1 was developed on the basis of the IPC Project 1124 Albatross in the German Democratic Republic (GDR) with the help of specialists from the Zelenodolsk shipyard for the Navy of the National People's Army of the GDR and the Warsaw Pact countries, as well as for export sales.[2]
Project 1331M was designed in the German Democratic Republic with the technical assistance of the Zelenodolsk Design Bureau for the USSR Navy, this project is a development of Project 133.1 and differs from it in the composition of weapons and navigation equipment.[2]
Construction and career
MPK-219 was laid down on 7 November 1986 at Peene-Werft, Wolgast. Launched on 30 September 1987 and commissioned on 23 December 1988 into the Baltic Fleet.[3]
The ship was decommissioned on 10 April 2002 and was later scrapped.
Pennant numbers
Date | Pennant number[3] |
---|---|
1988 | 08 |
1990 | 209 |
Citations
- Conway's All the World's Fighting Ships 1947–1995
- Saunders, Stephen (2009). Jane's Fighting Ships 2009-2010. Jane's Information Group. ISBN 978-0710628886.
- "Small Anti-Submarine Ships - Project 1331M". russianships.info. Retrieved 19 September 2021.