Nuclear-powered cruisers of the United States Navy
In the early 1960s, the United States Navy was the world's first to have nuclear-powered cruisers as part of its fleet. The first such ship was USS Long Beach (CGN-9). Commissioned in late summer 1961, she was the world's first nuclear-powered surface combatant. She was followed a year later by USS Bainbridge (DLGN-25). While Long Beach was a 'true cruiser', meaning she was designed and built as a cruiser, Bainbridge began life as a frigate, though at that time the Navy was using the hull code "DLGN" for "destroyer leader, guided missile, nuclear". This was prior to the enactment of the 1975 ship reclassification plan, in which frigates (DLG/DLGN), which were essentially large destroyers, were reclassified as cruisers, so that the US Navy's numbers would compete with those of the Soviet Navy. Long Beach, the largest of all the nuclear cruisers, was equipped with a C1W cruiser reactor, while all the others were equipped with D2G destroyer reactors.
In the summer of 1964, Long Beach and Bainbridge would meet up with USS Enterprise (CVAN-65), the Navy's first nuclear-powered aircraft carrier,[1] to form Task Force One, an all-nuclear-powered naval unit. They would commence Operation Sea Orbit, in which they circumnavigated the globe without refuelling. It was a remarkable achievement for its time, a naval group capable of sailing over 48,000 kilometers (26,000 nmi; 30,000 mi) in just 65 days, without replenishment.[2]
In the spring of 1967 came the Navy's third nuclear-powered cruiser, (though initially labeled a frigate), USS Truxtun (DLGN-35), a heavily modified design based on the Belknap-class cruiser. Truxtun would be followed by the two-ship California class, beginning with USS California (CGN-36) in February 1974 and USS South Carolina (CGN-37) in January 1975. The US Navy was the only fleet in the world with nuclear-powered cruisers until 1974 when the USSR would begin construction on their own nuclear battlecruiser, the Soviet battlecruiser Kirov, lead ship of the Kirov class. The Soviets would build four in total, between 1974 and 1998.
The last nuclear-powered cruisers the Americans would produce would be the four-ship Virginia class. USS Virginia (CGN-38) was commissioned in 1976, followed by USS Texas (CGN-39) in 1977, USS Mississippi (CGN-40) in 1978, and finally USS Arkansas (CGN-41) in 1980. Ultimately, nuclear-powered ships would prove to be too costly to maintain,[3] and they would all be retired between 1993 and 1999. A fifth Virginia-class vessel was initially planned but then cancelled.
The US Navy currently has the largest fleet of nuclear-powered aircraft carriers[4] and nuclear-powered submarines.
List of United States Navy nuclear-powered cruisers
Ship Name | Hull Number | Class | Length | Displacement | Commissioned | Decommissioned | Service Life | Notes |
---|---|---|---|---|---|---|---|---|
USS Long Beach | CGN-9 | Long Beach | 721 ft 3 in (219.84 m) | 15,540 tons | 9 September 1961 | 1 May 1995 | 33 years, 7 months and 23 days | |
USS Bainbridge | CGN-25 | Bainbridge | 565 ft 0 in (172.21 m) | 9,100 tons | 6 October 1962 | 13 July 1996 | 33 years, 9 months and 7 days | |
USS Truxtun | CGN-35 | Truxtun | 564 ft 0 in (171.91 m) | 8,659 tons | 27 May 1967 | 11 September 1995 | 28 years, 3 months and 15 days | |
USS California | CGN-36 | California | 587 ft 0 in (178.92 m) | 10,800 tons | 16 February 1974 | 9 July 1999 | 25 years, 4 months and 23 days | |
USS South Carolina | CGN-37 | California | 587 ft 0 in (178.92 m) | 10,800 tons | 25 January 1975 | 30 July 1999 | 24 years, 6 months and 5 days | |
USS Virginia | CGN-38 | Virginia | 586 ft 0 in (178.61 m) | 11,666 tons | 11 September 1976 | 10 November 1994 | 18 years, 1 month and 30 days | |
USS Texas | CGN-39 | Virginia | 586 ft 0 in (178.61 m) | 11,666 tons | 10 September 1977 | 16 July 1993 | 15 years, 10 months and 6 days | |
USS Mississippi | CGN-40 | Virginia | 586 ft 0 in (178.61 m) | 11,666 tons | 5 August 1978 | 28 July 1997 | 18 years, 11 months and 23 days | |
USS Arkansas | CGN-41 | Virginia | 586 ft 0 in (178.61 m) | 11,666 tons | 18 October 1980 | 7 July 1998 | 17 years, 8 months and 19 days |
- USS Long Beach
(CGN-9) - USS Bainbridge
(CGN-25) - USS Truxtun
(DLGN-35) - USS California
(CGN-36) - USS Virginia
(CGN-38) - USS Arkansas
(CGN-41)
See also
- Cold War
- List of United States Navy ships
- Nuclear navy
- Nuclear submarine
- Supercarrier
- USS Nautilus (SSN-571) (World's first nuclear-powered submarine)
References
- "USS Enterprise (CVN 65) Official Web Site". Archived from the original on 2013-03-01.
- "Operation Sea Orbit Celebration: A Legacy Like No Other - Naval Historical Foundation". navyhistory.org.
- "Nuclear power for surface combatants".
- Kyle Mizokami (25 January 2016). "Here Is Every Aircraft Carrier in the World". Popular Mechanics.
External links
Media related to United States Navy at Wikimedia Commons