Murray Hill station (LIRR)
Murray Hill is a station on the Long Island Rail Road's Port Washington Branch in the Murray Hill subsection of Flushing in Queens, New York City. The station is part of CityTicket. The station is located beneath 150th Street and 41st Avenue, just south of Roosevelt Avenue.
Murray Hill | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | 150th Street and 41st Avenue Murray Hill, Queens, New York | ||||||||||
Coordinates | 40.762703°N 73.814446°W | ||||||||||
Owned by | Long Island Rail Road | ||||||||||
Line(s) | Port Washington Branch | ||||||||||
Distance | 8.4 mi (13.5 km) from Long Island City[1] | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Connections | NYCT Bus: Q12, Q15, Q15A Nassau Inter-County Express: n20G, n20X | ||||||||||
Construction | |||||||||||
Parking | No | ||||||||||
Bicycle facilities | Yes | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | MHL | ||||||||||
Fare zone | 3 | ||||||||||
History | |||||||||||
Opened | 1889 | ||||||||||
Closed | 1912 | ||||||||||
Rebuilt | 1914, 1991–1993, 2005 | ||||||||||
Electrified | October 21, 1913 750 V (DC) third rail | ||||||||||
Passengers | |||||||||||
2012—2014 | 1,203[2] | ||||||||||
Rank | 70 of 125 | ||||||||||
Services | |||||||||||
|
History
Murray Hill station was originally built in April 1889, and torn down in 1912[3] when the Port Washington branch was depressed below grade in this area between 1912 and 1914. The station house was replaced in July 1914 with one built on a bridge built over the tracks.[4] This structure was torn down in 1964, and Murray Hill continues to operate as an unmanned station to this day. Minor renovations took place between 1991 and 1993. A new pedestrian bridge as well as other amenities were added in 2005. Two elevators were opened by May 4, 2020.[5] The elevators were originally slated for completion in 2019,[6] but were delayed to mid-2020 due to delays in the delivery of elevator cabs.
Station layout
The station has two high-level side platforms, each four cars long. The first four cars toward Manhattan and the last four cars toward Great Neck and Port Washington will platform.
G | Ground level | Exit/entrance, crossover, buses |
P Platform level |
Platform A, side platform | |
Track 1 | ← Port Washington Branch toward Penn Station or Grand Central Madison (Flushing–Main Street) | |
Track 2 | Port Washington Branch toward Great Neck or Port Washington (Broadway) → | |
Platform B, side platform |
References
- Long Island Rail Road (May 14, 2012). "TIMETABLE No. 4" (PDF). p. VI. Retrieved August 6, 2022.
- "2012-2014 LIRR Origin and Destination Report : Volume I: Travel Behavior Among All LIRR Passengers" (PDF). Metropolitan Transportation Authority. August 23, 2016. PDF pp. 15, 198. Archived (PDF) from the original on July 17, 2019. Retrieved March 29, 2020.
Data collection took place after the pretest determinations, starting in September 2012 and concluding in May 2014. .... 2012-2014 LIRR O[rigin and ]D[estination] COUNTS: WEEKDAY East/West Total By Station in Numerical Order ... Murray Hill
- "LIRR Station History (TrainsAreFun.com)". Archived from the original on May 26, 2017. Retrieved April 1, 2011.
- 1950's photo of 1914-64 Overpass Station House (Forgotten New York.com)
- "Capital Program Oversight Committee Meeting March 2020". mta.info. Metropolitan Transportation Authority. March 25, 2020. p. 92. Retrieved February 2, 2020.
- Monteverdi, Suzanne (February 8, 2018). "Two new elevators coming to Flushing's Murray Hill LIRR station in 2019". QNS.com. Retrieved August 9, 2018.
External links
- Murray Hill – LIRR
- Murray Hill LIRR timetable
- Forgotten NY.com(2005 photos):
- Murray Hill Station - "MI" Cabin (Arrt's Arrchives)
- 41st Avenue and 149th Place entrance from Google Maps Street View
- Barton Avenue entrance from Google Maps Street View
- Platforms from Google Maps Street View