M-12 motorway (Pakistan)
The M-12 motorway (Urdu: موٹروے 12), or the Sambrial-Kharian motorway, is a motorway in Pakistan, under construction since July 2022.[1] M-12 will connect Sambrial to Kharian. The 69 km (43 mi) long motorway will have 5 interchanges, a service area, and a 1 km (0.62 mi) long bridge spanning River Chenab. The M-12 will be a four-lane motorway (expandable to six-lanes) with a design speed of 120 km/h (75 mph) and an expected completion time of 2 years.[1][2]
M-12 motorway | |
---|---|
ایم ١٢ موٹروے | |
Sambrial-Kharian Motorway | |
Route information | |
Maintained by National Highway Authority | |
Length | 69 km (43 mi) |
History | Under Construction |
Major junctions | |
East end | Sambrial |
West end | Kharian |
Location | |
Country | Pakistan |
Major cities | |
Highway system | |
References
- Butt, Waseem Ashraf (2022-07-29). "Kharian-Sambrial motorway project's construction work launched". DAWN.COM. Retrieved 2022-12-09.
- "Gujrat-Sambrial-Kharian Motorway to be completed within two years". Pakistan Observer. 2022-11-10. Retrieved 2022-12-09.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.