Line 7 (Suzhou Rail Transit)

Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019.[1] The line will be 29.6 kilometers long.[1]

Line 7
Line 7 Under Construction at Tongyuanlu South station
Overview
StatusUnder construction
(Hongzhuang to Muli is operational as the branch of Line 4)
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations33
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
Technical
Line length29.6 km
Track gauge1,435 mm (4 ft 8+12 in)

According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7.[2]

It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.[3]

Stations

Station name[4][5] Connections Distance
km
Location
English Chinese
Moyang 莫阳 - 0 Xiangcheng
Zhujing 朱泾
Suzhou North Railway Station 高铁苏州北站  2 
Xuenan 雪南
Changlou 常楼
Dengyun 登云
Litanghelu 蠡塘河路
Chunshenhudonglu 春申湖东路
Huayuanlu East 华元路东
Baidang North 白荡北  8 
Baidang South 白荡南 SIP
Banjing 板泾
Yangjing 洋泾
Jicuiqiao 积翠桥
Central Park 中央公园  1 
Reyunqiao 惹云桥  6 
Huangtiandang 黄天荡  5 
Loufeng 娄葑
Qunli 群力
Tongyuanlu South 通园路南  3 
Linjiatan 林家潭 Wuzhong
Guoxiang 郭巷  2 
Yinshan 尹山
Jinjiaqiao South 金家桥南
Fengjinlu 枫津路
Hongzhuang 红庄  4 
Lishu 蠡墅
Shihu Moshe 石湖莫舍
Yuexi 越溪
Wenxi Lu 文溪路
Tian'edang Lu 天鹅荡路
Suzhouwan North 苏州湾北
Muli 木里

References

  1. "苏州轨道交通7号线开工建设". 2019-12-25.
  2. "苏州轨道交通". Archived from the original on 2012-07-13. Retrieved 2012-06-29. (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010))
  3. 顾蕾 (2012-02-10). 苏州轨交4号线及支线今年6月动工. 苏州日报 (in Chinese). Archived from the original on 2012-07-14. Retrieved 2012-06-19.
  4. "苏州轨交6、7、8号线车站站名公布!".
  5. "重磅!地铁6、7、8号线车站站名公示".


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.