Line 6 (Zhengzhou Metro)
Line 6 of Zhengzhou Metro (Chinese: 郑州地铁6号线; pinyin: zhèngzhōu dìtiě liùhào xiàn) is a rapid transit line in Zhengzhou.
Line 6 | |
---|---|
6 | |
Overview | |
Status | In operation |
Owner | Zhengzhou |
Locale | Zhengzhou, Henan, China |
Service | |
Type | Rapid transit |
System | Zhengzhou Metro |
Operator(s) | Zhengzhou Metro Group Corporation |
Rolling stock | 6-car Type A[1] |
History | |
Opened | 30 September 2022 |
Technical | |
Number of tracks | 2 |
Character | Underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 80 km/h[1] |
History
West section of Phase 1
The West section of Phase 1 is 16.7 km in length with 10 stations, from Jiayu to Changzhuang.[2] The section opened on 30 September 2022.[3]
East section of Phase 1
The section from Changzhuang to Qinghuafuzhong will open in 2024.
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Jiayu — Changzhuang | 30 September 2022 | 16.7 km[2] | 9 | west section of Phase 1 |
Jinzhenlu | 16 January 2023[4] | 1 | infill station |
Stations
References
- "郑州地铁6号线一期工程西段今起空载试运行". 2021-10-28.
- "郑州地铁6号线一期西段 即将空载试运行". 2021-09-27.
西段一共10个车站,约16.7公里
- "『郑州』地铁6号线一期工程西段即将开通运营". 2022-09-29.
- "1月16日起,郑州地铁6号线金桢路站启用". Sina (in Chinese). 16 January 2023. Retrieved 23 June 2023.
- "郑州地铁6号线一期工程西段今起空载试运行". 2021-10-28.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.