Line 3 (Harbin Metro)
Line 3 of the Harbin Metro (Chinese: 哈尔滨地铁三号线; pinyin: Hārbīn Dìtiě Sān Hào Xiàn) is a rapid transit line in Harbin, running from Sports Park to Taipingqiao.
Line 3 | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Owner | Harbin Government | ||
Locale | Harbin, Heilongjiang, China | ||
Stations | 27 (in operation) 36 (full line) | ||
Service | |||
Type | Rapid transit | ||
System | Harbin Metro | ||
Services | 1 | ||
Operator(s) | Harbin Metro Group Corporation | ||
History | |||
Planned opening | Phase II (Northwest): 2023 & 2024[1] | ||
Opened | Phase I: 26 January 2017 Phase II (Southeast): 26 November 2021[2] | ||
Technical | |||
Line length | 28 km (17.40 mi)[3][4] (in operation) 37.6 km (23.4 mi) (full line) | ||
Number of tracks | 2 | ||
Character | Underground | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
|
History
Phase 1
The first phase of the line, from Harbin West Railway Station to The Second Affiliated Hospital of Harbin Medical University, commenced operations on 26 January 2017.[5] It is 5.45 km[3] long with 5 stations, all of which are underground.
Harbindajie station opened as an infill station on June 16, 2017. Harbindajie station renamed to Kaishengyuan Plaza station on March 20, 2019.
Phase 2 (initial section)
The section from The Second Affiliated Hospital of Harbin Medical University to Taipingqiao, and the section from Harbin West Railway Station to Sports Park opened on November 26, 2021.[2][4]
Phase 2 (remaining section)
The remaining section will open in 2024 (nine stations).[1]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Harbin West Railway Station — The Second Affiliated Hospital of Harbin Medical University |
26 January 2017[6] | 5.45 km (3.39 mi)[3] | 3 | Phase 1 |
Kaishengyuan Plaza[lower-alpha 1] | 16 June 2017 | infill station | 1 | |
The Second Affiliated Hospital of Harbin Medical University — Taipingqiao |
26 November 2021[2] | 19.19 km (11.92 mi)[4] | 15 | Phase 2 (initial section) |
Harbin West Railway Station — Sports Park |
5 | |||
Taipingqiao — Chinese-baroque Block | 29 September 2023[7] | 3.4 km (2.11 mi) | 3 |
Stations
- Legend
- Stations in operation
- Under construction, opening in 2023 & 2024
Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Sports Park | 体育公园 | Daoli | |||
No.5 Qunli Avenue | 群力第五大道 | ||||
Qunli Hospital, the First Affiliated Hospital of Harbin Medical University | 医大一院群力院区 | ||||
Gongnong Street | 工农大街 | ||||
Chengxiang Road | 城乡路 | ||||
Harbin West Railway Station | 哈尔滨西站 | VAB | Nangang | ||
Kaishengyuan Plaza[lower-alpha 1] | 凯盛源广场 | ||||
Haxi Street | 哈西大街 | ||||
The Second Affiliated Hospital of Harbin Medical University | 医大二院 | 1 | |||
Zhengyi Road | 征仪路 | ||||
Harbin Medical University Cancer Hospital | 肿瘤医院 | ||||
Xusheng Street | 旭升街 | Xiangfang | |||
Labor Park | 劳动公园 | ||||
Jinxiang Street | 进乡街 | ||||
Turbine Co., Ltd | 汽轮机厂 | ||||
Youfang Street | 油坊街 | ||||
Gongbin Road | 公滨路 | ||||
Zhujiang Road | 珠江路 | 2 | |||
Xiangjiang Road | 湘江路 | Nangang | |||
Conference and Exhibition Center | 会展中心 | ||||
Haihe East Road | 海河东路 | ||||
Second Hospital of Harbin City | 市第二医院 | Daowai | |||
Dayoufang Street | 大有坊街 | ||||
Taipingqiao | 太平桥 | 1 | |||
Jingyu Park | 靖宇公园 | ||||
Harbin Mosque | 清真寺 | ||||
Chinese-baroque Block | 中华巴洛克街区 | ||||
Beima Road | 北马路 | ||||
Zhaolin Park · Harbin Children's Hospital | 兆麟公园·市儿童医院 | Daoli | |||
Friendship Palace Hotel | 友谊宫 | ||||
People's Square | 人民广场 | 2 | |||
Shanghai Street | 上海街 | ||||
Highway Bridge | 公路大桥 | ||||
Hesong Street | 河松街 | ||||
Heshan Street | 河山街 | ||||
Lilac Park | 丁香公园 | ||||
Notes
- Known as Harbindajie station (哈尔滨大街) before March 20, 2019.
Rolling stock
Services on the line are provided by six-car Type B trains, which have a total capacity of 1440. These trains are the same as those which run on Line 1.[8][9]
Future Development
The 32 km (20 mi) second phase of the line, which extends it to the southeast and northwest, began construction in 2017. It consists of 30 stations, of which 19 are on the southeastern portion and the remaining 11 on the northwestern. The southeastern portion opened on November 26, 2021,[2] while the northwestern would do so in 2023.[1]
Eventually, the line will be a loop line in Harbin. It will be 37 km (23 mi) long, with 36 stations.[10]
References
- "哈尔滨地铁三号线二期全面开工 2023年初实现通车". 2018-04-24. Archived from the original on 2019-11-07. Retrieved 2019-11-07.
- 东北网. "11月26日地铁3号线东南半环开通载客运营". Archived from the original on 2021-11-25. Retrieved 2021-11-25.
- "哈尔滨地铁3号线一期工程通车试运营 迎来"换乘"时代". 2017-01-26. Archived from the original on 2021-11-25. Retrieved 2019-11-07.
目前地铁3号线一期工程线路全长5.45公里
- "11月下旬载客试运营 线路全长19.19公里,沿途共设19座车站". 2021-10-23. Archived from the original on 2021-11-17. Retrieved 2021-11-17.
- "哈尔滨地铁3号线一期今日正式开通 附乘车票价表". news.focus.cn (in Chinese). 26 January 2017. Archived from the original on 3 February 2018. Retrieved 3 February 2018.
- "哈尔滨地铁3号线一期今日正式开通 附乘车票价表". news.focus.cn (in Chinese). 26 January 2017. Archived from the original on 3 February 2018. Retrieved 3 February 2018.
- "9月29日,哈尔滨地铁3号线这三站开通初期运营". thepaper.cn. 28 September 2023. Retrieved 30 September 2023.
- Barrow, Keith (26 January 2017). "Harbin opens metro Line 3". International Railway Journal. Archived from the original on 3 February 2018. Retrieved 3 February 2018.
- "哈尔滨地铁3号线一期首列列车抵哈调试". camet.org.cn (in Chinese). 27 September 2016. Archived from the original on 3 February 2018. Retrieved 3 February 2018.
- "哈尔滨地铁3号线34座站点公布 贯穿道里道外等四区". district.ce.cn (in Chinese). 22 October 2014. Archived from the original on 3 February 2018. Retrieved 3 February 2018.