Line 1 (Guiyang Metro)
Line 1 of the Guiyang Metro, is a subway line in Guiyang.
Line 1 | |
---|---|
1 | |
Overview | |
Status | Operational |
Locale | Guiyang, Guizhou Province, China |
Termini |
|
Stations | 25 |
Website | http://www.gyurt.com/ |
Service | |
Type | Rapid transit |
System | Guiyang Metro |
Operator(s) | Guiyang Urban Rail Transit (GYURT) |
Depot(s) | 2 |
History | |
Opened | 28 December 2017 |
Technical | |
Line length | 35.11 km (21.82 mi)[1][2] |
Number of tracks | 2 |
Character | Underground & Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead line |
Operating speed | 80 km/h |
The northern section (Guanshanhu section) opened on December 28, 2017.[3] The northern section has 10 stations and is 12.9 kilometres (8.0 mi)[3] long, from Xiamaixi to Guiyangbei Railway Station. The southern section was opened on December 1, 2018.[1][4] Douguan station opened on December 28, 2019.
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Xiamaixi — Guiyangbei Railway Station | 28 December 2017 | 12.9 km (8.02 mi)[3] | 10 | Phase 1 (Guanshanhu section) |
Guiyangbei Railway Station — Xiaomeng Industrial Park | 1 December 2018 | 14 | Phase 1 (Southern section) | |
Douguan — Xiamaixi | 28 December 2019 | 1 | Phase 1 (one-station extension) |
Stations
station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Douguan | 窦官 | Guanshanhu | ||||
Xiamaixi | 下麦西 | |||||
Laowantang | 老湾塘 | |||||
Yueshanhu Park | 阅山湖公园 | |||||
West Lincheng Road | 林城西路 | 2 | ||||
Guanshanhu Park | 观山湖公园 | |||||
International Eco-Conference Center | 国际生态会议中心 | T2 (U/C) | ||||
Yangguan | 阳关 | |||||
Xinzhai | 新寨 | |||||
Bailuhu | 白鹭湖 | |||||
Guiyangbei Railway Station | 贵阳北站 | GK KQW | ||||
Yaguan | 雅关 | Yunyan | ||||
Nanya Road | 南垭路 | |||||
Bageyan | 八鸽岩 | |||||
Beijing Road | 北京路 | 3 (U/C) | ||||
Penshuichi | 喷水池 | 2 | ||||
West Zhongshan Road | 中山西路 | |||||
Hebin Park | 河滨公园 | Nanming | ||||
Guiyang Railway Station | 贵阳火车站 | GIW | ||||
Shachong Road | 沙冲路 | |||||
Wangchengpo | 望城坡 | |||||
Zhujiang Road | 珠江路 | Huaxi | ||||
Changjiang Road | 长江路 | |||||
Qingshuijiang Road | 清水江路 | |||||
Xiaomeng Industrial Park | 小孟工业园 | |||||
Notes
References
- "贵阳市轨道交通1号线全线正式开通初期运营". 2018-12-01. Archived from the original on October 25, 2019.
- "贵阳轨道交通1号线全线开通运营 全长35.11公里设25座车站". 2018-12-01.
- "贵阳地铁驶来:1号线观山湖段试运行". Xinhua. Guiyang Daily. Archived from the original on December 28, 2017. Retrieved 20 July 2017.
- "刚刚定了!贵阳地铁1号线,12月1日全线通车_新闻频道_中国青年网".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.