Jurong Lake District MRT station
Jurong Lake District MRT station is a future underground Mass Rapid Transit station on the Cross Island line (CRL) located in Jurong East, Singapore. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.
Future Mass Rapid Transit (MRT) station | |||||||||||
General information | |||||||||||
Coordinates | 1°19′38″N 103°44′21″E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Line(s) | |||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opening | 2032 | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Jurong Lake District Jurong Lake District station in Singapore |
History
Jurong Lake District station was first announced on 20 September 2022 by Transport Minister S Iswaran. The station will be constructed as part of Phase 2 of the Cross Island line (CRL), a 15-kilometre (9.3 mi) segment spanning six stations from Turf City station to this station.[3][4] The station is expected to be completed in 2032.[5]
Details
Jurong Lake District station will serve the Cross Island line (CRL) and have an official station code of CR19. The station will be located in the future Jurong Lake District.[6] Due to the station's proximity to the nearby Jurong Town Hall station on the Jurong Region line, transport minister Iswaran stated a connection between the two stations is being studied, but added that the two stations are intended to serve "different commuter movement objectives".[7]
References
- "跨岛线第二阶段将有六个地铁站 预计2032年竣工". 早报 (in Chinese). 20 September 2022. Archived from the original on 21 September 2022. Retrieved 20 September 2022.
- "குறுக்குத் தீவு ரயில்பாதையின் 2ஆம் கட்டம் 2032ல் திறப்பு". tamilmurasu (in Tamil). 21 September 2022. Archived from the original on 21 September 2022. Retrieved 21 September 2022.
- Chew, Hui Min (20 September 2022). "Six more MRT stations will be built in Phase 2 of Cross Island Line; to open by 2032". CNA. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
- Kok, Yufeng (20 September 2022). "Cross Island Line phase 2 to open by 2032 with 6 MRT stations, from Turf City to Jurong Lake District". The Straits Times. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
- "Cross Island Line Phase 2". LTA. 20 September 2022. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
- "CR19 Jurong Lake District". LTA. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
- Lee, Amanda (24 September 2022). "Authorities studying if Jurong Lake District, Jurong Town Hall stations will be linked as interchange: S. Iswaran". The Straits Times. Archived from the original on 10 January 2023. Retrieved 24 September 2022.