Thames Gateway Transit
The Thames Gateway Transit was the collective name of two planned segregated bus schemes planned and partially implemented by Transport for London (TfL) in the east London section of the Thames Gateway redevelopment zone in England. They were:
- East London Transit, which opened in phases from 2010 and 2013
- Greenwich Waterfront Transit, which was cancelled in 2009
The Thames Gateway Bridge that would have connected the two systems was cancelled in 2008.[1]
East London Transit
East London Transit (ELT) is a part-segregated[2] bus rapid transit, operated as part of the London Buses network. The East London Transit opened in phases between 2010 and 2013, designed to meet the existing and anticipated demand for public transport in East London caused by the Thames Gateway redevelopment.[3] Originally, the ELT formed part of the Thames Gateway Transit proposal, which would use the Thames Gateway Bridge to connect to the Greenwich Waterfront Transit on the south side of the River Thames.[4][5]
Greenwich Waterfront Transit
Following construction of 1.8km of dedicated bus lanes along the Greenwich Peninsula to connect to North Greenwich station and the Millennium Dome in 2000,[6] Greenwich Waterfront Transit was proposed by TfL to connect development sites around the Millennium Dome, Charlton, Woolwich and Thamesmead on dedicated bus lanes.[7][8] Originally proposed to use optically guided trolleybuses, the system would have operated as part of the London Buses network.[9] Transport for London announced at the end of March 2009 that the Greenwich Waterfront Transit scheme would not proceed.[10]
Thames Gateway Transit
It was envisaged that the two schemes, while promoted separately by Transport for London, would have formed a single network connected by the Thames Gateway Bridge,[11][12] which was cancelled by then Mayor of London Boris Johnson in 2008.[1]
References
- Fisk, Robert (6 November 2008). "Greenwich shocked at Thames Gateway decision". News Shopper. Retrieved 28 December 2020.
- "Barking Riverside Extension Transport options summary report". Transport for London. Archived from the original on 5 April 2016. Retrieved 22 June 2017.
- "Mapping The Changes" (PDF). The Londoner. March 2006. Archived from the original (PDF) on 13 July 2009. Retrieved 4 February 2010.
- "alwaystouchout.com – East London Transit". www.alwaystouchout.com. Retrieved 28 December 2020.
- "East London Transit | Transport for London". Transport for London. 12 January 2008. Archived from the original on 12 January 2008. Retrieved 28 December 2020.
- "Trolleycoaches for London". www.tbus.org.uk. Retrieved 28 December 2020.
- "Greenwich Waterfront Transit: the history, cancellation and rebirth | Murky Depths". From the Murky Depths. 26 February 2019. Retrieved 28 December 2020.
- "alwaystouchout.com – Greenwich Waterfront Transit". www.alwaystouchout.com. Retrieved 28 December 2020.
- "Greenwich Waterfront Transit | Transport for London". Transport for London. 7 February 2008. Archived from the original on 7 February 2008. Retrieved 28 December 2020.
- "Greenwich Waterfront Transit scrapped". www.transportxtra.com. 3 April 2009. Retrieved 28 December 2020.
- "alwaystouchout.com – Thames Gateway Bridge". www.alwaystouchout.com. Retrieved 28 December 2020.
- "Thames Gateway Transit | Transport for London". Transport for London. 14 February 2008. Archived from the original on 14 February 2008. Retrieved 28 December 2020.