GO 59 Floating dock
GO 59 is a Floating dry dock of the Marina Militare.[4]
History | |
---|---|
Italy | |
Name | GO 59 |
Builder | Cantiere Navale Giacalone di Mazara del Vallo (Trapani) |
Cost | €7 million[1] |
Laid down | 2013 |
Launched | 2014 |
Acquired | 2011 |
Commissioned | march 2014 |
In service | 1 |
Homeport | Brindisi[2] |
General characteristics | |
Type | Floating dry dock |
Length | |
Beam |
|
Draught | 8.0 m (26 ft 3 in) (max)Error: has synonymous parameter (help) |
Draft | 9.5 m (31 ft 2 in) (max)Error: has synonymous parameter (help) |
Propulsion |
|
Notes | lifting capability 1.000 t (0.984 long tons) |
History
Delivered to Arsenale Militare Marittimo di Augusta on 26 March 2014,[5][6] it was transferred to Stazione Navale di Brindisi on 24 February 2016.[7]
These are the technical specifications of MM for its realization.
References
- Press release difesa.it (in Italian)
- "Trasferito a Brindisi il bacino galleggiante GO59 - Marina Militare". Archived from the original on 28 November 2016. Retrieved 27 November 2016.
- "Generalità e Struttura - Marina Militare". Archived from the original on 27 November 2016. Retrieved 27 November 2016.
- "Naviglio locale – Marina Militare". Marina.difesa.it. Retrieved 27 November 2016.
- "Marina Militare". www.marina.difesa.it. Archived from the original on 26 August 2014.
- "Marina Militare/ Mezzi. Il bacino Go59 arriva ad Augusta". 11 March 2014.
- "Trasferito a Brindisi il bacino galleggiante GO59 - Marina Militare". www.marina.difesa.it. Archived from the original on 28 November 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.