Corporation MRT station

Corporation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong West, Singapore.[1][2][3]

 JS5 
Corporation
企业
கார்ப்பரெஷன்
Future Mass Rapid Transit (MRT) station
Corporation MRT station site
General information
Coordinates1°21′11″N 103°42′50″E
Owned byLand Transport Authority
Line(s)
Platforms2 1 island platform
Tracks2
Construction
Structure typeElevated
Platform levels1
Bicycle facilitiesYes
AccessibleYes
History
Opening2027 (2027)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Hong Kah Jurong Region Line
Future service
Jurong West
towards Boon Lay
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Corporation
Corporation station in Singapore

History

On 9 May 2018, LTA announced that Corporation station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2027.[4]

Contract J103 for the design and construction of Corporation Station and associated viaducts was awarded to Eng Lee Engineering Pte Ltd - Wai Fong Construction Pte Ltd Joint Venture (JV) at a sum of S$274.3 million. Construction will start in 2020, with completion in 2027.[5] Contract J103 also includes the design and construction of Hong Kah station, and associated viaducts.[6]

Initially expected to open in 2026, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the JRL line completion, and the date was pushed to 2027.[7]

Location

The station will be straddled over the existing Jurong West Avenue 2, just east of the junction with Bulim Avenue and Corporation Road, and west of the PIE expressway exit. It is located within the Jurong West planning area between the Hong Kah and Wenya Subzones,[8] with a housing estate and the future site of Jurong Pioneer Junior College to the south, and the Bulim district of the future Jurong Innovation District to the north.[9]

Access to the station will be via 4 exits, 2 of each side of Jurong West Avenue 2.[10]

References

  1. "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  2. "Residents and students welcome Jurong Region Line but find it confusing". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  3. "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  4. "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  5. "LTA Awards Civil Contracts to Construct Five Stations for the Jurong Region Line | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  6. "Tender information | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  7. "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Retrieved 24 March 2021.
  8. "Singapore's Jurong West Planning Area". Key Location. Retrieved 2019-09-21.
  9. "JTC | Jurong Innovation District". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  10. "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.