Calvert Cliffs Nuclear Power Plant
The Calvert Cliffs Nuclear Power Plant (CCNPP) is a nuclear power plant located on the western shore of the Chesapeake Bay near Lusby, Calvert County, Maryland in the Mid-Atlantic United States. It is the only nuclear power plant in the state of Maryland.
Calvert Cliffs Nuclear Power Plant | |
---|---|
Country | United States |
Location | Calvert County, near Lusby, Maryland |
Coordinates | 38°25′55″N 76°26′32″W |
Status | Operational |
Construction began | June 1, 1968 |
Commission date | Unit 1: May 8, 1975 Unit 2: April 1, 1977 |
Construction cost | $2.206 billion (2007 USD)[1] |
Owner(s) | Constellation Energy |
Operator(s) | Constellation Energy |
Nuclear power station | |
Reactor type | PWR |
Reactor supplier | Combustion Engineering |
Cooling source | Chesapeake Bay |
Thermal capacity | 2 × 2737 MWth |
Power generation | |
Units operational | 1 × 863 MW 1 × 855 MW |
Make and model | CE 2-loop (DRYAMB) |
Units cancelled | 1 × 1600 MW US EPR |
Nameplate capacity | 1718 MW |
Capacity factor | 100.41% (2017) 82.90% (lifetime) |
Annual net output | 14,993 GWh (2021) |
External links | |
Website | Calvert Cliffs Nuclear Power Plant |
Commons | Related media on Commons |
Overview
The plant is owned and operated by Constellation Energy and has two 2737 megawatt thermal (MWth) Combustion Engineering Generation II two-loop pressurized water reactors. Each generating plant (CCNPP 1&2) produces approximately 850 megawatt electrical (MWe) net or 900 MWe gross. Each plant's electrical load consumes approximately 50 MWe. These are saturated steam plants (non-superheated) and are approximately 33% efficient (ratio of 900 MWe gross/2700 MWth core). Only the exhaust of the single high-pressure main turbine is slightly superheated by a two-stage reheater before delivering the superheated steam in parallel to the three low-pressure turbines. Unit 1 uses a General Electric–designed main turbine and generator, while Unit 2 uses a Westinghouse–designed main turbine and generator.[2] The heat produced by the reactor is returned to the bay, which operates as a cooling heat-sink for the plant.
Unit 1 went into commercial service in 1975 and Unit 2 in 1977.[2] The total cost of the two units was approximately US$766 million, about $3.699 billion in 2023.[3]
Unit 1 had its two steam generators replaced in 2002 and its reactor vessel closure head replaced in 2006, while unit 2 had its two steam generators replaced in 2003, and its vessel closure head replaced in 2007.
The water around the plant (see lower-right-center of photograph) is a very popular place for anglers. Unit 1 & 2 each takes in bay water (from the fenced-in area) to cool its steam driven turbine condensers plus other bay-water–cooled primary and secondary system heat exchangers. The bay water is pumped out at a nominal flow rate of 1.2 million gallons per minute (75,000 L/s) per unit (Unit 1 and 2) for each steam turbine condenser. The water is returned to the bay no more than 12 °F (6.7 °C) warmer than the bay water. Unlike many other nuclear power plants, Calvert Cliffs did not have to utilize water cooling towers to return the hot water to its original temperature. As the water comes out very quickly and creates a sort of artificial rip current, it can be a dangerous place to fish. CCNPP 3 will only need about 10% of the bay cooling water volume needed for Unit 1 and 2 combined. The increase in fish and shellfish impingement and entrainment will be less than 3.5% over Unit 1 and 2 existing conditions.
In February 2009, Calvert Cliffs set a world record for pressurized water reactors (PWRs) by operating 692 days non-stop.[4] In addition, Unit 2's capacity factor in 2008 was a world-record high of 101.37 percent.[5]
Electricity Production
Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Annual (Total) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2001 | 1,293,872 | 1,168,618 | 963,457 | 623,493 | 938,578 | 1,202,772 | 1,252,634 | 1,245,846 | 1,212,574 | 1,223,040 | 1,244,048 | 1,287,335 | 13,656,267 |
2002 | 1,288,202 | 862,457 | 645,092 | 619,921 | 639,467 | 829,551 | 1,146,622 | 1,242,220 | 1,211,273 | 1,271,399 | 1,079,479 | 1,292,322 | 12,128,005 |
2003 | 1,292,663 | 872,233 | 647,476 | 784,844 | 1,259,096 | 1,240,051 | 1,270,234 | 1,258,254 | 1,226,338 | 1,293,673 | 1,245,064 | 1,300,787 | 13,690,713 |
2004 | 1,245,680 | 1,218,948 | 1,261,451 | 816,454 | 1,104,627 | 1,250,809 | 1,278,968 | 1,272,708 | 1,231,056 | 1,301,634 | 1,274,705 | 1,323,220 | 14,580,260 |
2005 | 1,322,990 | 1,047,379 | 949,726 | 1,267,648 | 1,307,731 | 1,240,130 | 1,254,931 | 1,252,361 | 1,218,377 | 1,283,417 | 1,249,369 | 1,309,162 | 14,703,221 |
2006 | 1,296,648 | 992,845 | 648,193 | 1,014,558 | 1,303,841 | 1,246,405 | 1,264,266 | 1,258,643 | 1,233,168 | 1,287,865 | 1,153,244 | 1,130,735 | 13,830,411 |
2007 | 1,297,997 | 1,086,076 | 661,313 | 1,182,021 | 1,303,229 | 1,241,232 | 1,266,519 | 1,251,396 | 1,223,218 | 1,264,543 | 1,262,781 | 1,312,867 | 14,353,192 |
2008 | 1,315,326 | 1,069,745 | 976,840 | 1,262,420 | 1,292,113 | 1,231,842 | 1,242,086 | 1,235,296 | 1,213,153 | 1,273,123 | 1,261,192 | 1,305,559 | 14,678,695 |
2009 | 1,303,777 | 1,045,223 | 940,839 | 1,260,328 | 1,291,934 | 1,226,644 | 1,158,547 | 1,245,982 | 1,225,916 | 1,282,637 | 1,259,342 | 1,308,950 | 14,550,119 |
2010 | 1,312,339 | 743,084 | 806,878 | 1,257,938 | 1,140,982 | 1,208,350 | 1,228,584 | 1,234,815 | 1,214,634 | 1,280,334 | 1,256,430 | 1,309,580 | 13,993,948 |
2011 | 1,315,452 | 865,796 | 965,147 | 1,264,689 | 1,298,663 | 1,182,649 | 1,247,953 | 1,171,521 | 1,217,571 | 1,277,972 | 1,273,121 | 1,316,903 | 14,397,437 |
2012 | 1,316,989 | 662,951 | 649,574 | 1,051,724 | 1,309,178 | 1,244,799 | 1,170,262 | 1,147,869 | 1,230,720 | 1,301,649 | 1,196,588 | 1,296,963 | 13,579,266 |
2013 | 1,326,175 | 950,117 | 784,587 | 1,283,601 | 1,094,820 | 1,249,816 | 1,262,218 | 1,258,216 | 1,140,152 | 1,306,577 | 1,279,188 | 1,328,838 | 14,264,305 |
2014 | 1,131,490 | 920,341 | 885,275 | 1,284,065 | 1,258,025 | 1,238,371 | 1,237,907 | 1,262,348 | 1,226,067 | 1,296,681 | 1,277,023 | 1,325,741 | 14,343,334 |
2015 | 1,327,603 | 919,447 | 1,036,388 | 1,184,895 | 1,301,932 | 1,255,122 | 1,279,970 | 1,282,379 | 1,245,002 | 1,317,016 | 1,280,853 | 1,212,718 | 14,643,325 |
2016 | 1,277,060 | 905,712 | 1,081,688 | 1,280,694 | 1,311,965 | 1,232,424 | 1,280,694 | 1,268,992 | 1,241,410 | 1,304,576 | 1,279,860 | 1,295,102 | 14,760,177 |
2017 | 1,329,771 | 853,695 | 1,215,964 | 1,294,186 | 1,328,553 | 1,271,137 | 1,298,704 | 1,293,666 | 1,265,599 | 1,316,555 | 1,295,563 | 1,343,595 | 15,106,988 |
2018 | 1,346,338 | 960,036 | 972,281 | 1,287,475 | 1,333,913 | 1,276,519 | 1,303,698 | 1,283,282 | 1,246,389 | 1,320,437 | 1,305,333 | 1,352,230 | 14,987,931 |
2019 | 1,352,917 | 956,165 | 981,233 | 1,303,153 | 1,334,182 | 1,272,540 | 1,300,484 | 1,284,026 | 1,264,678 | 1,312,355 | 1,302,614 | 1,348,575 | 15,012,922 |
2020 | 1,349,218 | 939,661 | 1,058,722 | 1,298,643 | 1,339,557 | 1,278,643 | 1,299,341 | 1,289,513 | 1,262,085 | 1,323,210 | 1,295,674 | 1,346,290 | 15,080,557 |
2021 | 1,350,621 | 1,163,666 | 832,885 | 1,297,994 | 1,337,931 | 1,278,215 | 1,263,359 | 1,288,572 | 1,253,272 | 1,320,373 | 1,259,115 | 1,347,630 | 14,993,633 |
2022 | 1,281,507 | 723,066 | 1,295,799 | 1,289,866 | 1,331,688 | 1,266,856 | 1,285,312 | 1,268,268 | 1,111,644 | 1,325,007 | 12,179,013 | ||
2023 |
Surrounding population
The Nuclear Regulatory Commission defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity.[7]
The 2010 US population within 10 miles (16 km) of Calvert Cliffs was 48,798, an increase of 86.4 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within 50 miles (80 km) was 2,890,702, a decrease of 2.0 percent since 2000. Cities within 50 miles include Washington, D.C., (45 miles to city center).[8]
Risks and concerns
Proximity to LNG plant
In 2001, when the Dominion Cove Point LNG plant was scheduled to reopen, many local residents were concerned about the proximity to this nuclear power plant (3 miles). Residents thought that the FERC did not consider the risks could be caused by an attack or an explosion before opening the plant.[9]
Seismic risk
The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Calvert Cliffs was 1 in 100,000 for Reactor 1 and 1 in 83,333 for Reactor 2, according to an NRC study published in August 2010.[10][11]
Environmental concerns
Scientists at Johns Hopkins University became concerned that the discharge of heated cooling water from the plant would be detrimental to a crucial element of the Chesapeake Bay ecosystem, the bay's famed blue crabs.[12] In the late 1960s, litigation borne of Congress's National Environmental Policy Act eventually spawned one of the most celebrated environmental cases in American history, Calvert Cliffs' Coordinating Committee, Inc. v. Atomic Energy Commission, forcing the Atomic Energy Commission (now the Nuclear Regulatory Commission) to consider the environmental impact of building and maintaining such an atomic energy plant.[13]
2000 renewal of operating license
In 2000, the Nuclear Regulatory Commission extended the license of the plant for 20 additional years, making Calvert Cliffs the first nuclear plant in the United States to receive such an extension. President George W. Bush visited the plant in June 2005, the first time a president had visited a nuclear power plant in nearly two decades.[14]
Proposal to add a third reactor
UniStar Nuclear Energy announced plans to build a unit of the Evolutionary Power Reactor (US-EPR variant) at Calvert Cliffs. UniStar Nuclear Energy, a Delaware limited liability company, was jointly owned by Constellation Energy (CEG) and Électricité de France (EDF), the French builder and supplier of nuclear power plants. The proposed unit was to produce approximately twice the energy of each individual existing unit. On July 13, 2007, UniStar Nuclear Energy filed a partial application to the Nuclear Regulatory Commission to review its plans to build a new nuclear power plant, Calvert Cliffs Nuclear Power Plant 3 (CCNPP 3) based on the AREVA US Evolutionary Power Reactor[15] (US-EPR), Generation III+,[16] four loop pressurized water reactor.
The third reactor was intended to address a need for more baseload power generation in the Mid-Atlantic region. The unit proposed to be located south of the existing units 1 and 2, set back from the shoreline. Although only a single unit, its power plant footprint was almost twice the size of the existing units together. It was to have a closed-loop cooling system using a single hybrid mechanical draft cooling tower, incorporating plume abatement for no visible water vapor plume from the tower. Units 1 and 2 use an open-cycle heat dissipation system without cooling towers. The cooling tower of the Unit 3 reactor was to release two thirds of its waste heat to the atmosphere. The proposed EPR design was a saturated steam plant with one high-pressure turbine in tandem with three low-pressure turbines and a main generator design similar to Unit 1 and 2. Alstom was to supply the main steam turbine and main generator.
On November 13, 2007, UniStar Nuclear Energy filed an application for a certificate of public convenience and necessity with the Maryland Public Service Commission for authority to construct CCNPP 3. This application is being considered in Case Number 9127.[17]
Opponents and supporters of the proposed third reactor at Calvert Cliffs were involved in a series of public hearings before officials of the US Nuclear Regulatory Commission. In March 2009, Bill Peil of southern Calvert County asked the Nuclear Regulatory Commission to deny an emissions permit for the reactor due to health and safety concerns he asserted that the plant posed to the community. UniStar Nuclear Energy President and CEO George Vanderheyden urged the NRC to approve the air permit application.[18]
In October 2010, Constellation Energy said that it had reached an impasse in negotiations for a federal loan guarantee to build the proposed third reactor. The government sought a fee of $880 million on a guarantee of about $7.6 billion, to compensate taxpayers for the risk of default. Constellation Energy replied that such a fee would doom the project, “or the economics of any nuclear project, for that matter”.[19][20][21]
In November 2010 a deal to transfer Constellation Energy Group's stake in a nuclear development company to its French partner, EDF Group, closed, according to the SEC. A month prior, Constellation agreed to sell its 50 percent stake in UniStar Nuclear Energy to EDF for US$140 million, giving EDF sole ownership of the joint venture and its plans to develop a third unit at Calvert Cliffs in Southern Maryland. The deal called for EDF to transfer 3.5 million shares it owns, valued around US$110 million, to Constellation and give up its seat on the Constellation board. EDF designee Samuel Minzberg resigned.
In April 2011 the Nuclear Regulatory Commission (NRC) stated that UniStar is not eligible to build a third reactor, as it is not a US owned company since Constellation pulled out of the partnership in 2010. The NRC would continue to process the application, but a license would not be issued until the ownership requirements were met. The reactor was estimated to cost $9.6 billion.[22]
Constellation Energy merged into Exelon in 2012.
In 2015 Areva, struggling with internal restructuring of its corporation, withdrew from the certification process for the US EPR reactor design, effectively putting on hold plans for the deployment of a European reactor in the US.[23][24]
Incidents
Unit 2 at the Calvert Cliffs nuclear power plant was shut down on September 5, 2013, after a malfunction during testing. It was re-opened September 10, 2013, after the required maintenance was performed.[25]
Reactor data
The Calvert Cliffs Nuclear Power Plant consist of two operational reactors, one additional was proposed in 2007 and withdrawn.
Reactor unit[26] | Reactor type | Capacity(MW) | Construction started | Electricity grid connection | Commercial operation | Shutdown | |
---|---|---|---|---|---|---|---|
Net | Gross | ||||||
Calvert Cliffs-1 | CE 2-loop | 855 | 918 | 01/06/1968 | 03/01/1975 | 08/05/1975 | |
Calvert Cliffs-2 | 850 | 911 | 01/06/1968 | 07/12/1976 | 01/04/1977 | ||
Calvert Cliffs-3 (planned)[27] | US-EPR | 1600 | ? | ||||
See also
References
- "EIA - State Nuclear Profiles". www.eia.gov. Retrieved 3 October 2017.
- "Calvert Cliffs Nuclear Plant". Constellation Energy. Archived from the original on 2010-01-05. Retrieved 2010-01-14.
- Vera Foster Rollo. Your Maryland A History. p. 374.
- "Calvert Cliffs Nuclear Plant Unit 2 Sets World Record". Constellation Energy. 2009. Archived from the original on 2012-03-01. Retrieved 2010-01-14.
- "Maryland Chamber of Commerce Visits Calvert Cliffs Nuclear Power Plant". Business Wire. June 19, 2009. Retrieved 2010-04-20.
- "Electricity Data Browser". www.eia.gov. Retrieved 2023-01-08.
- "NRC: Backgrounder on Emergency Preparedness for Nuclear Power Plants". Archived from the original on 2006-10-02. Retrieved 2012-08-17.
- Bill Dedman. Nuclear neighbors: Population rises near US reactors. msnbc.com, April 14, 2011,. Accessed May 1, 2011.
- "Worries Aside, Cove Point Gas Plant Gets a Green Light". Bay Weekly. 2001-01-03. Archived from the original on March 21, 2006. Retrieved October 9, 2010.
- Bill Dedman, "What are the odds? US nuke plants ranked by quake risk," NBC News, March 17, 2011 http://www.nbcnews.com/id/42103936 Accessed April 19, 2011.
- "Archived copy" (PDF). Archived from the original (PDF) on 2017-05-25. Retrieved 2011-04-19.
{{cite web}}
: CS1 maint: archived copy as title (link) - "The Story of Calvert Cliffs Coordinating Council: A Court Construes the National Environmental Policy Act to Create a Powerful Cause of Action" (PDF). Archived from the original (PDF) on 2012-03-02. Retrieved 2010-09-06.
- Calvert Cliffs' Coordinating Council v. Atomic Energy Commission
- "Nuclear Technology Milestones". Nuclear Energy Institute. Archived from the original on 2010-03-24. Retrieved 2010-01-14.
- "EPR: the first generation III+ reactor currently under construction". AREVA NP. 2008-01-04. Archived from the original on 2007-12-24. Retrieved 2008-01-09.
- "EPR: Generation III+ Performance Fact Sheet" (PDF). AREVA NP. 2008-01-04. Retrieved 2008-01-09.
- "Case Number: 9127". Maryland Public Service Commission. 2007-11-13. Archived from the original on 2008-01-05. Retrieved 2008-01-06.
- NRC hears both sides of nuclear expansion debate
- Matthew L. Wald. Fee Dispute Hinders Plan for Reactor The New York Times, October 9, 2010.
- Matthew L. Wald. Sluggish Economy Curtails Prospects for Building Nuclear Reactors, The New York Times, October 10, 2010.
- Peter Behr. Constellation Pullout From Md. Nuclear Venture Leaves Industry Future Uncertain The New York Times, October 11, 2010.
- Andrea K. Walker (April 8, 2011). "French-owned UniStar not eligible to build nuclear reactor at Calvert Cliffs". Baltimore Sun. Retrieved April 9, 2011.
- "US EPR plans suspended". World Nuclear News. 2015-03-06. Retrieved 2015-03-26.
- "Calvert Cliffs 3 COL withdrawn". World Nuclear News. 21 July 2015. Retrieved 21 July 2015.
- Russell, Scott. "Calvert Cliffs unit brought back online Tuesday after maintenance". Southern Maryland Newspapers Online. Archived from the original on 2013-12-02. Retrieved 26 November 2013.
- Power Reactor Information System of the IAEA: „United States of America: Nuclear Power Reactors- Alphabetic“ Archived June 4, 2011, at the Wayback Machine
- Power Reactor Information System of the IAEA: „Nuclear Power Reactor Details - CALVERT CLIFFS-3“
External links
- Exelon - Calvert Cliffs
- Électricité de France
- Maryland Nuclear Profile - US Dept. of Energy
- "Calvert Cliffs PWR". Nuclear Engineering International Wall Charts. University Libraries, University of New Mexico. May 1974. Retrieved 2016-11-01.