Tiwi Geothermal Power Plant
The Tiwi Geothermal Power Plant is a 234-MW geothermal power station in Tiwi, Albay, Philippines.
Tiwi Geothermal Power Plant | |
---|---|
Country | Philippines |
Location | Albay, Philippines |
Coordinates | 13°27′56.5″N 123°38′58.1″E |
Status | Operational |
Commission date | 1979 |
Owner(s) | AP Renewables |
Operator(s) | AP Renewables |
Geothermal power station | |
Type | Flash steam (existing) / Binary cycle (planned) |
Power generation | |
Units operational | 4 units[1] |
Units planned | 1 unit |
Nameplate capacity | 234 MW |
History
The Commission on Volcanology conducted an exploration of the Tiwi geothermal field from 1964 to 1968.[2]
The Philippine government in early 1971 invited the Union Oil Company of California (Unocal) to form the Philippine Geothermal, Inc. (PGI) which is intended as a joint venture for the exploration and development of geothermal energy. A service contract was made with the state-owned National Power Corporation (NPC) on September 10, 1971.
PGI contributed technical knowledge as well as a portion of the Tiwi field's exploration and development. NPC would construct and run the geothermal power stations. The first two units were put into service in 1979. Units 3 through 6 would be operational from 1980 to 1982.[2]
The geothermal field would then be acquired by Aboitiz Power in 2009.[3][4]The company would own and operate the plant under its subsidiary AP Renewables.[5]
In January 2023, a new binary cycle power plant within the Tiwi Geothermal Power Plant broke ground. It will add 17-MW capacity to the existing geothermal complex.[6]
Facilities
The Tiwi Geothermal Field is divided into four geographical areas: Naglagbong, Kapipihan, Matalibong, and Bariis.[2] At one point it had six units and a 330-MW capacity.[7]
As of December 2021, the Tiwi geothermal facility has four units and a capacity of 234-MW.[1]
References
- "List of Existing Power Plants (Grid-connected) as of December 2021" (PDF). Department of Energy. Retrieved April 9, 2023.
- "Tiwi". National Geothermal Association of the Philippines. Retrieved April 9, 2023.
- Gatdula, Donnabelle (July 31, 2008). "Aboitiz group bags Tiwi-Makban power complex with $447-M bid". ABS-CBN News. Retrieved April 9, 2023.
- Gatdula, Donnabelle (October 2, 2009). "Aboitiz Power pays full P12.12 billion for Tiwi-Makban". The Philippine Star. Retrieved April 9, 2023.
- Macapagal, Jed (January 29, 2023). "Powering up communities for cleaner, better future". Malaya Business Insights. Retrieved April 9, 2023.
- "AboitizPower expects 17 MW more from Tiwi geothermal". BusinessWorld. January 17, 2023. Retrieved April 9, 2023.
- "Tiwi Geothermal Power Plant Complex Rehabilitation Project" (PDF). Archived (PDF) from the original on March 8, 2012. Retrieved March 24, 2011.