Line 11 (Shanghai Metro)

Line 11 is a northwest–southeast line of the Shanghai Metro network. Since October 2013, Line 11 serves Kunshan city, making it is the second intercity metro in China after the Guangfo Metro and the first that crosses a provincial boundary. With a single-line mileage of 82.386 kilometres (51.192 mi), it is the second-longest single-line subway line in China, after Line 6 in Chongqing, which is 85.6 km (53.2 mi) long. The line is colored brown on system maps.

Line 11
Qilianshan Road Station
Overview
Other name(s)R3 (planned name);
Shenjia line (Chinese: 申嘉线)
Native name上海地铁11号线
StatusOperational
OwnerShanghai Rail Transit Shenjia Line Development Co., Ltd. (Shanghai segment)
Kunshan Rail Transit Investment Development Co., Ltd. (Kunshan segment)
LocalePudong; Xuhui, Changning, Putuo, and Jiading districts, Shanghai, China
Kunshan, Jiangsu, China
Termini
Stations39 (plus reserve station Yanyu Road)
Service
TypeUrban rail transit in China Rapid transit
SystemShanghai Metro Shanghai Metro
ServicesMainline: Disney ResortNorth Jiading
Branchline: Disney ResortHuaqiao
Operator(s)Shanghai No. 2 Metro Operation Co. Ltd.
Depot(s)Shanghai Circuit Depot;
North Jiading parking lot;
Chuanyang River parking lot
Rolling stock82 Type A 6-car trains
Daily ridership1.012 million (2019 peak)[1]
History
CommencedDecember 30, 2005 (2005-12-30)
OpenedDecember 31, 2009 (2009-12-31)
Last extensionApril 26, 2016 (2016-04-26)
Technical
Line length82.4 km (51.20 mi)
Number of tracks2
CharacterUnderground, open cut + elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts DC)
Operating speed100 km/h (62 mph)
Average speed: 40.3 km/h (25 mph) (mainline) 38.8 km/h (24 mph) (branchline)
SignallingThales’ SelTracTM CBTC
Route map
Route on the Shanghai map:
To scale geographic map:

History

The line 11 was originally planned to be from Jiading to Nanhui New City, with a total length of 120 kilometres (75 mi), the south part of the line has been transferred to line 16.

The 1st phase of line 11, which runs from North Jiading to Jiangsu Road, opened on 31 December 2009.[2][3] A branch line from Anting opened on 29 March 2010.[4]

The 2nd phase runs from Jiangsu Road to Luoshan Road. It opened on 31 August 2013.[5]

The 3rd phase connects Luoshan Road and the Disney Resort. This section is 9.4 kilometres (5.8 mi) long with 3 stations. All new stations except for the Disney Resort station opened on December 19, 2015.[6] The Disney Resort started to trial operation on April 26, 2016.[7]

From January 26, 2020 until March 24,[8] the Kunshan section of line 11 (Anting to Huaqiao) was suspended due to the COVID-19 pandemic.[9]

On August 25, 2020, an infill station Chenxiang Highway was opened.[10]

From February 14, 2022, the Kunshan section of line 11 was again suspended due to the COVID-19 pandemic.[11]

Shanghai Metro Line 11 opening history
SegmentCommencementOpenedLengthStation(s)NameInvestment
Jiangsu Road — North Jiading 30 Dec 2005 31 Dec 2009 33.0 km (20.51 mi) 16 Phase 1 (main section) ¥18.95 billion
Jiading Xincheng — Anting 30 Dec 2005 29 Mar 2010 12.8 km (7.95 mi) 3 Phase 1 (branch section)
East Changji Road 26 Apr 2011 Infill station 1
Luoshan Road — Jiangsu Road 19 Dec 2008 31 Aug 2013 19.2 km (11.93 mi) 12 Phase 2 ¥12.965 billion
Anting — Huaqiao 27 Oct 2010 16 Oct 2013 7.0 km (4.35 mi) 3 Huaqiao extension ¥1.849 billion
Kangxin Highway — Luoshan Road 28 May 2013 19 Dec 2015 4.10 km (2.55 mi) 2 Disney extension (1st section) ¥4.371 billion
Disney Resort — Kangxin Highway 28 May 2013 26 Apr 2016 5.08 km (3.16 mi) 1 Disney extension (2nd section)
Chenxiang Highway 25 Aug 2020 Infill station 1

Controversy

Due to the long length of line 11 and high passenger volumes, it is common for line 11 passengers to be forced to stand on the train for their entire trip. In response to this, around early 2014, some passengers that travelled long distances between urban area and the suburban areas of Jiading or Sanlin that cannot bear standing for a long time started bringing their own small folding seats into the carriages. In the following years, the official Weibo of Shanghai Metro reminded passengers involved phenomenon to be safe and civilized as Shanghai Metro maintains that these foldable seats can be a safety hazard on trains and reduces capacity. Beginning in 2019, line 11 started having announcements in carriages to remind passengers to not bring and use their own seats on the train.[12][13]

Stations

Service routes

Shanghai Metro Line 11 service routes
Routes Station name Connections Distance Location Open-
ing
Plat-
form[14]
M P English Chinese km min
Mainline
Disney Resort 迪士尼 0.00 0.00 0 Pudong 26 April
2016[15]
Underground Island[16]
Kangxin Highway 康新公路 5.08 5.08 5 19 Dec
2015[17]
Elevated Side
Xiuyan Road 秀沿路 2.32 7.40 8
Luoshan Road 罗山路  16  1.78 9.18 11 31 Aug
2013[18]
Elevated Island
Yuqiao 御桥  18  2.51 11.69 14 Underground Island
Yanyu Road 严御路 1.73 13.42 17 Reserve Underground Island
Pusan Road 浦三路 1.46 14.88 19 31 Aug
2013[18]
Underground Side
East Sanlin 三林东 1.58 16.46 21 Underground Island
Sanlin 三林 1.21 17.67 23 Underground Double Island
Oriental Sports Center 东方体育中心  6   8  3.13 20.8 28 Underground Double Island (shared with  6 )
Longyao Road 龙耀路 2.14 22.94 31 Xuhui Underground Island
Yunjin Road 云锦路 0.76 23.70 33
Longhua 龙华  12  1.01 24.71 35
Shanghai Swimming Center 上海游泳馆 1.39 26.10 38
Xujiahui 徐家汇  1   9  1.85 27.95 41
Jiaotong University 交通大学  10  0.88 28.83 43 Changning
Jiangsu Road 江苏路  2  2.08 30.91 46 31 Dec
2009[19]
Longde Road 隆德路  13  1.35 32.26 49 Putuo
Caoyang Road 曹杨路  3   4   14 [lower-roman 1] 0.98 33.24 51 Underground Double Island[lower-roman 2]
Fengqiao Road 枫桥路 0.81 34.05 53 Underground Island
Zhenru 真如  14  1.05 35.10 55 Underground Side & Island
Shanghai West Railway Station 上海西站  15  Shanghai West railway station SXH 1.35 36.45 57 Underground Island
Liziyuan 李子园 1.45 37.90 60
Qilianshan Road 祁连山路 1.35 39.25 62
Wuwei Road 武威路 1.32 40.57 65
Taopu Xincun 桃浦新村 1.59 42.16 67
Nanxiang 南翔 3.13 45.29 71 Jiading Elevated Side & Island
Chenxiang Highway 陈翔公路 2.36 47.65 74 25 Aug
2020[20]
Elevated Side
Malu 马陆 3.40 51.05 78 31 Dec
2009[19]
Jiading Xincheng 嘉定新城 2.90 53.95 82 Elevated Side & Island
Mainline
Baiyin Road 白银路 1.89 55.84 84 Jiading 31 Dec
2009[19]
Elevated Side
West Jiading 嘉定西 3.29 59.13 88 Elevated Island
North Jiading 嘉定北 1.94 61.07 91 Elevated Side
Branchline
Shanghai Circuit 上海赛车场 3.15 64.22 86 Jiading 29 March
2010[21]
Open-cut Side
East Changji Road 昌吉东路 5.27 69.49 91 26 April 2011[22] At-grade Side
Shanghai Automobile City 上海汽车城 2.25 71.74 94 29 March
2010[21]
Elevated Side
Anting 安亭 1.84 73.58 97 Elevated Island
Zhaofeng Road 兆丰路 1.12 74.70 100 Kunshan, JS 16 Oct
2013[23]
Guangming Road 光明路 3.29 77.99 104 Elevated Side
Huaqiao 花桥 Suzhou Rail Transit  11  (Suzhou Rail Transit) 1.27 79.26 107
Passengers going to Huaqiao at Disney Resort Station, Kangxin Highway Station and Xiuyan Road Station during rush hour have to transfer at Jiading Xincheng Station.
  1. Virtual transfer with line 14 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.
  2. The platform in the direction of Disney Resort is on the B2 floor, and the platform in the direction of North Jiading and Huaqiao is on the B3 floor. It was originally planned that line 14 would transfer at this station on the same station as this line. Later, because line 14 adopted the Wuning Road plan, the reserved platform was abandoned. Therefore, the actual use of this station is a side stacking platform.

Yanyu Road station

Although Yanyu Road station is part of the second phase of Line 11, it did not open with the other stations on August 31, 2013.[24] Instead, it has been left as a reserved station under construction that will open in the future pending development in the area.[25][26]

Station name change

Headways

Shanghai Metro Line 11 headway[27]
TimeNorth Jiading -
Jiading Xincheng
& Huaqiao - Jiading Xincheng
Jiading Xincheng -
Nanxiang
Nanxiang -
Luoshan Road
Luoshan Road -
Disney Resort
Monday - Friday (Working Days)
AM peak7:30-9:00Southbound: 6 - 10 min
Northbound: 7 min and 30 sec - 10 min
Southbound: 3 min
Northbound: 3 min and 45 sec
Southbound: 2 min
Northbound: 2 min and 30 sec
Southbound: 6 min
Northbound: 7 min and 30 sec
Off-peak9:00–17:00About 12 minAbout 6 min
PM peak17:00–19:00Southbound: 7 min
Northbound: 6 min
Southbound: 3 min and 30 sec
Northbound: 2 min and 30 sec
Southbound: 7 min
Northbound: 6 min
Other
hours
Before 7:30
After 19:00
About 12-18 minAbout 5 – 7 min
Saturday and Sunday (Weekends)
Peak8:00–20:0010 minAbout 5 min
Other
hours
Before 8:00
After 20:00
About 10-12 minAbout 6-8 min

Technology

Rolling Stock

Shanghai Metro Line 11 rolling stock
SetManufacturerTime of
manufac-
turing
TypeNo
of
car
Assembly[lower-roman 1]SeriesNumberNotes
66CRRC Zhuzhou Locomotive Co., Ltd.2008-2011A[lower-roman 2]6Tc+Mp+M+M+Mp+Tc11A011101-1166[28] Some of the trains are Disney-themed trains, and the inside and outside of the trains are packaged with Disney cartoon elements.
Original set name: AC16.
6CNR Changchun Railway Vehicles Co., Ltd.2015-2016A[lower-roman 2]6Tc+Mp+M+M+Mp+Tc11A021167-1172
10CRRC Zhuzhou Locomotive Co., Ltd.2015-2016A[lower-roman 2]6Tc+Mp+M+M+Mp+Tc11A031173-1182
  1. Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.
  2. Type A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.

References

  1. 【 1329.4万人次】3月8日上海地铁客流创历史新高 (in Chinese). Shanghai Metro. 2019-03-09. Retrieved 2019-03-09.
  2. "International Railway Journal - Rail and Rapid Transit Industry News Worldwide". Archived from the original on 2009-01-22. Retrieved 2008-11-11.
  3. "沪轨交9号线二期、11号线北段一期31日开通试运营".
  4. 11号线支线下周一试运营, news.163.com. Retrieved 28 March 2010.
  5. "Metro extension to open next year".
  6. 上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06.
  7. "上海地铁迪士尼站下周二开站 末班车最晚22:30". Xinmin.cn. 2016-04-21. Retrieved 2016-04-21.
  8. "24日起上海轨交11号线恢复跨省运营". CCTV. 2020-03-23. Retrieved 2020-03-24.
  9. Yihong, Dong (2020-01-27). "为阻断疫情传播,上海轨交11号线花桥站至安亭站区段停运_新民社会_新民网". Xinmin.cn. Retrieved 2020-01-26.
  10. "上海轨道交通11号线陈翔公路站将于8月25日开通". 2020-08-23.
  11. Hui, Liu (2022-02-14). "上海轨交11号线昆山段3站暂停运营". eastday.com. Retrieved 2022-04-28.
  12. Shanghai line 11 warns the "bench family" for the first time: Do not use your own small bench in the carriage. Xinmin Evening News. 2019-02-20
  13. Xiong Yingqi. Passengers of Shanghai Metro Line 11 board the train with a bench and become a unique warning. Beijing Youth Daily. 2019-02-21.
  14. 乘车指南 > Station信息. Shanghai Metro Official Site. Retrieved 2015-12-17. Instructions: 点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。
  15. 上海地铁迪士尼站下周二开站 末班车最晚22:30. 新民网. 2016-04-21. Retrieved 2016-04-21.
  16. 11号线迪士尼段正式命名 地铁"迪士尼"站亮相. 东方网. 2014-12-10.
  17. 上海地铁运管中心 (2015-12-17). 12月19日起 11、12、13号线新延伸段建成试运营. Shanghai Metro Official Site. Retrieved 2015-12-17.
  18. 上海地铁运管中心 (2013-08-29). 11号线二期8月31日起通车试运营. Retrieved 2013-08-29.
  19. 上海轨交9号线2期11号线北段1期12月31日开通. Tencent (QQ) News. 2009-12-28.
  20. "上海轨道交通11号线陈翔公路站将于8月25日开通". 2020-08-23.
  21. 3月29日11号线支线嘉定新城—安亭通车试运营 11号线"Y型"线路运营同步覆盖早晚高峰. Shanghai Metro Official Site. 2010-03-26.
  22. 11号线昌吉东路站开通 方便周边乘客. Shanghai Metro Official Site. 2011-04-28.
  23. 上海地铁11号线今开通花桥段 安亭到花桥仅10分钟. 东方网. Retrieved 2013-10-17.
  24. Shanghai Metro (2013-08-29). 11号线二期8月31日起通车试运营 (in Chinese). Retrieved 2013-08-29.
  25. 途经5个区可换乘11条轨交 11号线北段二期今年内完工. Eastday (in Chinese (China)). 2012-08-05.
  26. 上海市轨道交通11号线北段工程补充环境影响评价公示 (in Chinese)
  27. "Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Retrieved 2021-07-07.
  28. 上海市轨道交通十一号线北段车辆. 中车株洲电力机车有限公司 (in Chinese). 2013-11-24. Retrieved 2020-03-20.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.