Ritson Road GO Station

Ritson Road GO Station is a planned GO Transit train station to be built by Metrolinx in Oshawa, Ontario, Canada as part of the approved expansion of train service on the Lakeshore East line to Bowmanville.[3] It will be built on the south side of an existing freight rail line owned by Canadian Pacific Railway, on a section of land formerly occupied by Ontario Malleable Iron Company until 1977 and later by Knob Hill Farms (1980 to 2000) at 500 Howard Street in downtown Oshawa.[4]

Ritson Road
General information
LocationFront Street[1]
Oshawa, Ontario
Coordinates43°53′18″N 78°51′13″W
Owned byMetrolinx
Tracks2[1]
Connections
Construction
Parking1,228[2]
AccessibleYes
Services
Preceding station GO Transit Following station
Thornton's Corners East Lakeshore East
(planned expansion)
Courtice
towards Bowmanville

In 2011, Metrolinx planned to abandon service at its existing Oshawa GO Station once the expansion was completed; thus, at that time, the Ritson Road location would have become the new Oshawa GO Station.[5] However, by 2022, Metrolinx decided to continue to serve the existing Oshawa GO Station and chose the name of Ritson Road for the planned station.[6][1]

Description

According to a 2011 environmental impact assessment, approximately 1,228 parking spaces would be supplied on opening day, and future parking expansions would be possible. Bike shelters, a bus loop and a kiss-and-ride area would be included. GO Transit planned to work with the City of Oshawa and preserve older façade sections of a building on the station site.[2]

According to a 2023 revised proposal, the Bowmanville extension will be double-tracked between Courtice and Ritson Road GO Stations, and will be located on the south side of, and separate from, CP Rail's Belleville Subdivision. Station facilities will be located on the south side of the GO Transit tracks.[1]

History

By 2011, Metrolinx was planning to convert a building that used to be a Knob Hill Farms grocery store at 500 Howard Street into a GO train station located near Simcoe Street, but the plans to build a station there were scrapped due to environmental concerns and the challenge of reaching a fair purchase price with the property owner.[7] However, Metrolinx was ready to restart negotiations if both sides could come to an agreement on a fair purchase price for the building.[8] Metrolinx ultimately expropriated the site and took possession of it on July 25, 2014, even though the purchase price had not been settled at that time.[9]

References

  1. "Bowmanville Extension  Project Overview – Key Components" (PDF). Metrolinx. p. 5. Archived (PDF) from the original on June 15, 2023. Retrieved June 14, 2023.
  2. "Oshawa To Bowmanville Rail Service Expansion And Rail Maintenance Facility - Environmental Assessment Study" (PDF). GO Transit. 2011. Archived from the original (PDF) on 11 September 2014. Retrieved 10 September 2014.
  3. Minister of the Environment (28 March 2011). "Minister's Notice To Proceed With Transit Project" (PDF). Ontario Regulation 231/08. Archived from the original (PDF) on 11 September 2014. Retrieved September 11, 2014. I hereby give notice allowing GO Transit and Metrolinx to proceed with the Oshawa To Bowmanville GO Train Service Expansion transit project in accordance with the applicable environmental project report.
  4. Zochodne, Geoff. "Metrolinx bites bullet for new GO station". The Oshawa Express. Retrieved 11 September 2014.
  5. "Oshawa to Bowmanville rail service expansion and rail maintenance facility - Environmental Assessment Study, Public Information Centre" (PDF). Metrolinx. January 2011. Archived from the original (PDF) on 22 June 2011. Retrieved 13 September 2014.
  6. "Bowmanville Expansion". Metrolinx. Retrieved June 14, 2023.
  7. Follert, Jillian (November 14, 2011). "Metrolinx derails plans for Oshawa GO station". DurhamRegion.com. Archived from the original on May 23, 2012.
  8. Follert, Jillian (November 18, 2011). "Metrolinx would resume GO negotiations on Knob Hill Farms site for the right price". DurhamRegion.com. Archived from the original on November 22, 2011.
  9. Szekely, Reka (July 30, 2014). "Oshawa Knob Hill Farms property expropriated for new GO station". DurhamRegion.com. Archived from the original on February 11, 2021.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.