Matadi–Kinshasa Railway

The Matadi–Kinshasa Railway (French: Chemin de fer Matadi-Kinshasa) is a railway line in Kongo Central province between Kinshasa, the capital of Democratic Republic of the Congo, and the port of Matadi.

Matadi train station, September 2015
Matadi–Kinshasa Railway
km
elev
in m
365
Kinshasa East
307
to Kinshasa West
N'dolo N'Dolo Airport
Limete Amicongo
Limete
Limete UZAM
(Kingabwa)
to Ndjili Airport N'djili Airport
Matete
Rifflart
Kilembo
338
Kimwenza
330
Block 329
321
Kasangulu
400
Vindevoghel
Bailleux
Wolter
277
Sona Bata
531
266
Madimba
532
Nguvu
247
Kisantu–Inkisi
520
Block 236
225
0
Marchal
580
16
Mbanza-Ngungu
(Thysville)
741
216
Kiasi-Pass
669
Kiasi
198
Dethieu
454
194
Kolo
439
187
Cattier
420
176
Moerbeke
400
Tumba
154
Lukala
390
143
Kimpese
333
Malanga
Kwilu
Block 110
Block 100
93
Songololo
320
Cipello
74
Lufu
315
Monolithe
Fornasari
38
Kenge
265
Tombagadio
Bousin
8
Mpozo
72
270 m
0
Matadi ferry/water interchange
28
Petrocongo ferry/water interchange
8
Ango-Ango ferry/water interchange
km
elev
in m

The Matadi–Kinshasa Railway was built between 1890 and 1898 in order to bypass the series of rapids and falls which hindered access from the South Atlantic Ocean to the Congo Basin.[1] Its length is 366 km (227 mi) and it is run by Société commerciale des transports et des ports (SCTP) (until 2011, ONATRA). The line reopened in September 2015 after about a decade without regular service. As of April, 2016 there was one passenger trip per week along the line and more frequent service was planned.[2]

History

The first locomotive arriving at Léopoldville in 1898
The line in 1913 (with also the first section of the Mayumbe Railway in the North)
The new track as it could be seen on 25 July 1927 (engineer's map).

In the 1880s the exploration and exploitation of the Congo territory was carried out by the Congo Free State, which benefitted from hydrographic network of the Congo River. But between Matadi and Kinshasa (formerly known as Léopoldville), the river was not navigable, being barred by the Livingstone Falls, which follow one another for 300 km (190 mi). Transport was done by human bearers, which was not very efficient and often fatal. Therefore, it was decided to build a railway line along this route.

The Compagnie du Congo pour le Commerce et l'Industrie (CCCI) was incorporated on 31 July 1887. On the same day its subsidiary the Compagnie du Chemin de Fer du Congo (CCFC) was created. Work on the railway was directed by Albert Thys, who would give his name to one of the stations, Thysville (now Mbanza-Ngungu). The completion of the railway officially cost the lives of 1,932 people (1,800 Africans and 132 Europeans), although the real numbers were likely higher. Up to 60,000 labourers worked on the project at one time.[3]

The main difficulty was to make it possible for the railway line to leave the gorges of the Congo River, through the canyon of the M'pozo River and a passage along the Monts de Cristal.

The living conditions in the construction of this railway were miserable. The sanitary and medical facilities were insufficient. In 1892, about two thousand people worked on the railroad, of which an average of one hundred and fifty workers per month lost their lives due to smallpox, dysentery, beriberi and exhaustion. By the end of 1892, 7,000 workers had already been recruited, 3,500 of whom had died or fled (for example, to neighboring forests). These conditions made it more difficult to recruit workers. Thys therefore attracted people from Barbados and China in September and November 1892 respectively. The Barbadians refused to leave the boats in the port of Matadi until they were forced by firearms. Seven people lost their lives in this action.[4]

The hard labour on the railway line is mentioned by Joseph Conrad in his novel Heart of Darkness, which he witnessed when he worked in the Congo Free State. It is also shown in the 2016 movie The Legend of Tarzan.

Started in 1890, the railway line was completed in 1898. It was built to a nominal gauge of 750 mm (2 ft 5+12 in), and all rolling stock was constructed to this gauge. However, as local labour had difficulty grasping the concept of gauge widening on curves, the entire line was built to a gauge of 765 mm (2 ft 6+18 in).[5][6] Alterations were made from 1923 to 1931, when it was converted to 3 ft 6 in (1,067 mm) gauge on a new alignment. Several tens of thousands of people, convicts and forced workers, were employed for this renovation. Seven thousand people lost their lives here.

In spite of the technical and financial difficulties related to the construction of the railway line, the railway line very quickly proved to be profitable, mainly because of the transportation of ivory and rubber. As a 750 mm (2 ft 5+12 in) gauge railway it operated a large fleet of 0-6-0T, 0-6-2T, 2-6-2T locomotives before turning to 32 0-6-0+0-6-0 Garratts, and finally 5 - outside-framed 2-8-2 locomotives.

The railway can be classified as a portage railway.

Border change

In 1928, Congo (Belgium) and Angola (Portugal) did a land exchange to facilitate the new route of the railway to Congo-Kinshasa.[7]

Specifications

1898-1932 1932–present[8]
Route original deviation
Gauge 750 mm (2 ft 5+12 in) 1,067 mm (3 ft 6 in)
Rails 21.5 kg/m (43.3 lb/yd) 33.4 kg/m (67.3 lb/yd)
Axle load 10 t (11 short tons; 10 long tons) 15 t (17 short tons; 15 long tons)
Length 401 km (249 mi) 365 km (227 mi)[9]
Grade (max.) 45‰ (4.5%) 17‰ (1.7%)
Radius (min.) 55 yd (50.3 m) 273 yd (249.6 m)

Main stations

Present day

The railway line and the port of Matadi are currently the main connection for Kinshasa to the external world. The renovation of the Road to Matadi, in beginning of the 2000s, however somewhat alleviated this situation.

The railway line is underused and dangerous.

2012

Angola is proposing to link its three isolated lines, and also to link with adjacent countries including the Matadi-Kinshasa line. By using the Matadi Bridge which used to be a road-rail bridge, a connection to the Cabinda enclave is possible.[10]

2015

The line reopened in September 2015 after around a decade without regular service. As of April, 2016 there was one passenger trip per week along the line and more frequent service was planned.[2]

Incidents

On November 26, 2003, a train ran off the line after hitting a landslide and fell into the river, resulting in ten casualties.[11][12]

See also

References

  1. Headrick, Daniel R. (1981). The tools of empire : technology and European imperialism in the nineteenth century. Oxford University Press. pp. 196–197. ISBN 0-19-502831-7. OCLC 905456588.
  2. "Plus de 13 000 passagers transportés par train entre Kinshasa et Matadi" (in French). Radio Okapi. 10 April 2016. Retrieved 16 April 2017.
  3. Headrick, Daniel R. (1981). The tools of empire : technology and European imperialism in the nineteenth century. Oxford University Press. p. 198. ISBN 0-19-502831-7. OCLC 905456588.
  4. Verbeeck, Mathijs (2019). "MASTERPROEF: DWANGARBEID IN DE BELGISCHE RECHTSGESCHIEDENIS (1885–1945)". Masterproef voorgelegd voor het behalen van de graad master in de rechten (in Dutch). No. 2018–2019.
  5. Neil Robinson: World Rail Atlas and Historical Summary 7. North, East and Central Africa. 2009.
  6. Durrant, A.E., A.A. Jorgensen, C.P. Lewis. Steam in Africa, London, 1981, Hamlyn.
  7. [Railways Africa 2014 issue 5, p29]
  8. Blanchart Charles: Le Rail au Congo Belge (2 tomes). Bruxelles: Blanchart, 1993/1999.
  9. 246 mi (396 km) including the branches to Ango-Ango and Mbanza-Ngungu (Thysville)
  10. Railway Gazette International September 2012, p42
  11. "CNN.com - At least 60 missing in Congo ferry, train disasters - Nov. 26, 2003". edition.cnn.com. Retrieved 2021-09-17.
  12. "Toll rises in Congo train crash". www.aljazeera.com. Retrieved 2021-09-17. 10 died in 2003 accident when a train derailed

5.8195°S 13.4912°E / -5.8195; 13.4912

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.