List of Edmonton LRT stations

Edmonton Light Rail Transit, commonly referred to as the LRT, is a light rail system in Edmonton, Alberta. Part of the Edmonton Transit Service (ETS), the 21-kilometre Capital Line starts at Clareview in Edmonton's northeast and ends at Century Park in Edmonton's south end.[1] A second route, the Metro Line to areas north of the downtown, opened on September 6, 2015.[2][3][4] The Metro Line includes a 3.3-kilometre (2.1 mi) extension in the LRT system from Churchill LRT Station in downtown Edmonton northwest to NAIT LRT Station.[2]

Rapid transit map

Lines and stations

Capital Line Capital Line 21 km (13 mi) 15 stations
Metro Line Metro Line 8.8 km (5.5 mi) 10 stations (7 shared with Capital Line)
Valley Line Valley Line (Under construction) 13.1 km (8.1 mi) 12 stations
Station Line Opened Average daily boardings[5] Grade Parking spaces[6]
Bay/Enterprise Square Capital Line Metro Line19835,231Underground0
Belvedere Capital Line19784,029Surface761
Central Capital Line Metro Line19786,241Underground0
Century Park Capital Line201014,607Surface0
Churchill Capital Line Metro Line Valley Line1978 (Underground)

2023 (Surface)

9,834Underground and Surface0
Clareview Capital Line19818,040Surface1,393
Coliseum Capital Line19783,444Surface0
Corona Capital Line Metro Line19839,049Underground0
Government Centre Capital Line Metro Line19893,105Underground0
Health Sciences/Jubilee Capital Line Metro Line20068,446Surface0
Kingsway/Royal Alex Metro Line20152,357Surface0
MacEwan Metro Line20152,456Surface0
McKernan/Belgravia Capital Line20092,104Surface0
NAIT Metro Line20152,931Surface0
South Campus/Fort Edmonton Park Capital Line20095,140Surface0
Southgate Capital Line20109,250Surface0
Stadium Capital Line19782,715Surface520
University Capital Line Metro Line199213,672Underground0

Future stations

Station Line Planned
opening
Grade
102 StreetValley Line2023At-grade
AvonmoreValley Line2023At-grade
Bonnie DoonValley Line2023At-grade
DaviesValley Line2023Elevated
Grey NunsValley Line2023At-grade
HolyroodValley Line2023At-grade
Mill WoodsValley Line2023At-grade
Millbourne/WoodvaleValley Line2023At-grade
MuttartValley Line2023At-grade
QuartersValley Line2023At-grade
StrathearnValley Line2023At-grade

References

  1. "The Way We Move LRT for Everyone" (PDF). Edmonton Transit System and City of Edmonton. pp. 4–5. Archived from the original (PDF) on 2015-09-10. Retrieved 2015-09-08.
  2. "Metro Line (North LRT to NAIT)". City of Edmonton. September 7, 2015. Archived from the original on September 7, 2015. Retrieved September 8, 2015.
  3. Clark, Debra (September 6, 2015). "Highly anticipated Metro LRT line opens to public". CTV News. Retrieved September 8, 2015.
  4. "Edmonton opens northern Metro Line". Railway Gazette International. September 8, 2015. Retrieved September 8, 2015.
  5. "2019 LRT Passenger Count Report" (PDF).
  6. "Regular Park and Ride Locations". ETS. Retrieved February 26, 2021.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.