Line H (Buenos Aires Underground)

Line H is a line of the Buenos Aires Underground. The first phase, between Plaza Once and Caseros, which opened on 18 October 2007, currently stretches over 8.8 km between Hospitales and Facultad de Derecho stations.[3][4] It is the first entirely new line built in Buenos Aires since the opening of Line E on 20 June 1944.

Line H map

Line H
Overview
Termini
Stations12
Service
TypeRapid transit
SystemBuenos Aires Underground
Operator(s)Metrovías
Rolling stock300 Series
Daily ridership128,000 (2018)[1] 23.68% [2]
History
Opened18 October 2007
Technical
Line length8.8-kilometer (5.5 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationCatenary 1500 V DC
Route map

Retiro
Mitre Line
Terminal de Ómnibus
Bus interchange
Padre Mugica
planned extension
 
Facultad de Derecho
Las Heras
Santa Fe
Córdoba
Corrientes
Once
Domingo Faustino Sarmiento Railway
Venezuela
Humberto I
Inclán
Caseros
Colonia Workshops
Parque Patricios
Shops
Hospitales
Sáenz
under construction
Belgrano Sur Line

According to projections, the line will stretch a total of about 11.85 km and will run from between Retiro to Sáenz once the remaining sections are constructed. It connects the southern part of the city with the north, improving traffic flow to the centre of the city. It is also designed to serve as a transversal line and provide cross-connections across all radial lines, mainly under the axis of Jujuy and Pueyrredón avenues.

Rolling stock

The 300 Series (right) replaced the temporary Siemens-Schuckert Orenstein & Koppel stock (left).

During its early years, Line H was served by a temporary fleet of refurbished and original vintage Siemens-Schuckert Orenstein & Koppel train sets originally introduced on line C, with electric current supplied by overhead lines. The cars featured 42 seats and 4 doors per side.[5]

As the line was extended and passenger numbers increased, the rolling stock was replaced by new Alsom 300 Series units ordered from that company in 2012 in order to make up the entirety of the Line's rolling stock. The first 6 of the 120 new Alstom cars arrived In August 2015, with the remainder phased-in as the line has been extended.[6][7][8][9]

Further expansion

Visitors at Las Heras station before its inauguration.

An initial extension to Corrientes station was inaugurated on Monday 6 December 2010.[10] The Córdoba and Las Heras stations opened in December 2015 with Santa Fe station (which links Line H to Line D) opening in April 2016. Alstom Metropolis rolling stock is now being used on the line. [11]

The Facultad de Derecho station (located at the University of Buenos Aires Faculty of Law) was originally intended to be located across the road next to Plaza Francia, however concerns that it would damage the prestigious Recoleta Cemetery necessitated revisions to these plans and therefore delayed construction of the station, which eventually opened in May 2018.[12] The final stretch to Retiro is not set to open until some time after the revision of the route following the relocation of the Plaza Francia station.

Chronology

DateText
2007-10-18Line H was inaugurated between Once and Caseros.
2010-12-06The line is extended northbound from Once to Corrientes.[13]
2011-10-04Parque Patricios station opened.
2012-01Works in the extension towards Plaza Francia (North) and Nueva Pompeya (South) began.
2013-05-27Hospitales station opened.
2015-12-18Las Heras and Cordoba stations opened.
2016-07-12Santa Fe station opened.
2018-05-17Facultad de Derecho station opened.