Line 3 (Wuhan Metro)
The Line 3 of Wuhan Metro (Chinese: 武汉地铁三号线) is a metro line in Wuhan. This line crosses five districts of Wuhan: Jiang'an District, Jianghan District, Qiaokou District, Hanyang District and Caidian District (Wuhan Economic-Technological Zone, WEDZ), and is the first line to cross the Han River. It started operation on December 28, 2015.[2][3]
Line 3 | |
---|---|
Overview | |
Status | Operating |
Owner | Government of Wuhan |
Locale | Wuhan, Hubei |
Termini | |
Stations | 24 |
Service | |
Type | Rapid transit |
System | Wuhan Metro |
Services | 1 |
Operator(s) | Wuhan Metro Group Co., Ltd. |
Rolling stock | CRRC Changchun Railway Vehicles Chinese Type B |
History | |
Opened | 28 December 2015 |
Technical | |
Line length | 33.2 km (20.63 mi)[1] |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
History
On February 23, 2012, National Development and Reform Commission approved all construction of Line 3[4] and construction started on March 31.[5][6] All tunnels of Line 3 were finished on October 8, 2015,[7] and all tracks were finished on October 28, 2015.[8] The line started operation on December 28, 2015.[2]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Zhuanyang Boulevard — Hongtu Boulevard | 28 December 2015 | 29.660 km (18.43 mi) | 24 | Phase 1 |
Stations
Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Zhuanyang Boulevard | 沌阳大道 | Auto-city Tram (via Chelun Square) | 0.000 | 0.000 | Hannan |
Dongfeng Motor Corporation | 东风公司 | 6 | 1.449 | 1.449 | Caidian |
Sports Center | 体育中心 | 0.842 | 2.291 | ||
Sanjiaohu | 三角湖 | 1.454 | 3.745 | ||
Hanyang Long-Distance Bus Station | 汉阳客运站 | 1.563 | 5.308 | ||
Sixin Boulevard | 四新大道 | 0.928 | 6.236 | ||
Taojialing | 陶家岭 | 1.359 | 7.595 | Hanyang | |
Longyangcun | 龙阳村 | 0.906 | 8.501 | ||
Wangjiawan | 王家湾 | 4 | 1.107 | 9.608 | |
Zongguan | 宗关 | 1 | 2.531 | 12.139 | Qiaokou |
Shuangdun | 双墩 | 0.982 | 13.121 | ||
Wuhan Business District | 武汉商务区 | 7 | 1.825 | 14.946 | Jianghan |
Yunfei Road | 云飞路 | 1.227 | 16.173 | ||
Fanhu | 范湖 | 2 | 0.885 | 17.058 | |
Lingjiaohu | 菱角湖 | 1.676 | 18.734 | ||
Xianggang Road | 香港路 | 6 7 | 0.932 | 19.666 | Jiang'an |
Huiji 2nd Road | 惠济二路 | 0.934 | 20.600 | ||
Zhaojiatiao | 赵家条 | 8 | 0.896 | 21.496 | |
Luojiazhuang | 罗家庄 | 0.882 | 22.378 | ||
Erqi Branch Road | 二七小路 | 0.759 | 23.137 | ||
Xingye Road | 兴业路 | 1.253 | 24.390 | ||
Houhu Boulevard | 后湖大道 | Yangluo | 1.181 | 25.571 | |
Citizens Home | 市民之家 | 1.667 | 27.238 | ||
Hongtu Boulevard | 宏图大道 | 2 8 | 2.422 | 29.660 | |
Rolling stock
Type | Time of manufacturing | Sets | Assembly | Notes |
---|---|---|---|---|
Type B | 2015 | 29 | Manufactured by CRRC Changchun Railway Vehicles.[9] |
The first train of Line 3 arrived on March 25, 2015 from CRRC Changchun Railway Vehicles.[10] A further order of 19 six-car sets was made in 2019.[11]
References
- 挖了五年武汉地铁2号线26日贯通 年底通车 (in Chinese). Retrieved 2012-02-24.
- 武汉即将地铁成环 "环金时代"重构商业地理 (in Chinese). 长江日报. 2015-12-24. Archived from the original on December 24, 2015. Retrieved 2015-12-24.
- "One more line! Map of new Wuhan Metro Line 3". Wuhan Time. Nov 27, 2015. Retrieved Dec 24, 2015.
- 武汉地铁3号线获国家发改委批复 一期下月全面开工 (in Chinese). Retrieved 2012-02-22.
- 武汉地铁3号线今天正式动建 首穿汉江江底 (in Chinese). Archived from the original on December 24, 2015. Retrieved March 30, 2012.
- 武汉地铁3号线拟于31日全线开工 线路图抢先看 (in Chinese). Retrieved March 28, 2012.
- 武汉市副市长王立到武汉三号线七标调研 (in Chinese). Archived from the original on 2015-12-24. Retrieved 2015-12-24.
- 由公司承建的武汉地铁三号线一期工程全线轨道工程顺利贯通,标志着该工程主体施工全面完成 (in Chinese). Archived from the original on 2015-12-24.
- "招标/资格预审公告 - 武汉市轨道交通三号线一期工程车辆系统采购项目".
- "1st train of Wuhan Metro Line 3 arrives in Wuhan". Hubei Provincial People’s Government. March 26, 2015. Retrieved Dec 24, 2015.
- "招标/资格预审公告 - 武昌火车站-光谷火车站,全长12.3公里。".