Georgia State Route 5

State Route 5 (SR 5) is a 155.325-mile-long (249.971 km) state highway that travels south-to-north through portions of Carroll, Douglas, Cobb, Cherokee, Pickens, Gilmer, and Fannin counties in the western and northern parts of the U.S. state of Georgia. The highway travels from its southern terminus at SR 48 at the Alabama state line, north-northwest of Ephesus, to its northern terminus at SR 60 and SR 68 at the Tennessee state line on the McCaysvilleCopperhill line, bisecting the northwestern portion of the state.

State Route 5 marker

State Route 5

Georgia State Route 5 highlighted in red
Route information
Maintained by GDOT
Length155.325 mi[1] (249.971 km)
Existed1919[2]–present
Major junctions
South end SR 48 at the Alabama state line near Ephesus
Major intersections
North end SR 60 and SR 68 at the Tennessee state line on the McCaysvilleCopperhill line
Location
CountryUnited States
StateGeorgia
CountiesCarroll, Douglas, Cobb, Cherokee, Pickens, Gilmer, Fannin
Highway system
  • Georgia State Highway System
SR 4 SR 6

Route description

SR 5 starts at the Alabama state line just east of Graham and north-northwest of Ephesus, in Carroll County, where the highway continues west into Randolph County, Alabama as SR 48. In Carroll County, the highway initially travels northeast, but soon turns to the east, and bisects the southern portion of rural Carroll County. SR 5 crosses U.S. Route 27/SR 1 (US 27/SR 1) in Roopville, and continues east until it nears the Chattahoochee River, where it turns northeast to parallel the river, and travels through Whitesburg. SR 5 continues northeast, then cuts north into Douglas County, where it is locally known as Bill Arp Road, crosses Interstate 20 (I-20) in Douglasville.[1][3]

Continuing northeast, and having picked up a concurrency with US 78/SR 8, the highway heads through Lithia Springs, crosses US 278/SR 6, and enters Cobb County and Austell. In Austell, SR 5 splits from US 78/SR 8 and heads slightly northeast through the western parts of Smyrna to just west of Dobbins Air Reserve Base. Traveling concurrently with SR 280, the highways wind to the north around Dobbins as South Cobb Drive, and SR 5 splits off and travels to the north by itself into Marietta as Atlanta Road. The highway then makes a sharp turn to the west and travels concurrently with SR 120 Loop, and both turn north again to just avoid the Marietta Square to its west.[1][3]

Curving to the northeast past the square, SR 5 leaves its concurrency with SR 120 Loop behind and heads north yet again, first as Cherokee Street, then Church Street, and curves to the northeast as it crosses US 41/SR 3. Soon thereafter, SR 5 merges with I-75 for a very short distance, and then splits off I-75 north of Marietta, together with its concurrency with I-575, and heads north and northeast into Cherokee County in the direction of Woodstock. From Marietta to Blue Ridge, the route parallels the Marietta and North Georgia Rail Line.[1][3]

SR 5 remains concurrent with I-575 for that route's entire length, as the two highways bisect Cherokee County, and bypass Holly Springs, Canton (crossing the Etowah River north of Canton), and Ball Ground. North of Ball Ground, near Nelson, I-575, as well as the freeway portion of the highway, terminates, and SR 5, now concurrent with SR 515, enters Pickens County. The highways curve northwest around Jasper, then turn back to the north near Talking Rock on their way into Gilmer County and Ellijay. In East Ellijay, SR 5 picks up a concurrency with US 76/SR 2, and heads northeast into the Chattahoochee National Forest in the direction of Blue Ridge in Fannin County. In Blue Ridge, US 76/SR 2/SR 515 head off to the east, while SR 5 heads northwest to McCaysville and its northern terminus at the Tennessee state line, where the route intersects the northern terminus of SR 60 (Toccoa Avenue) and continues into Tennessee as SR 68 (which also has the Toccoa Avenue name).[1][3]

National Highway System

The following portions of SR 5 are part of the National Highway System, a system of routes determined to be the most important for the nation's economy, mobility, and defense:

  • The entire concurrency with SR 92 (on US 78/SR 8) in Douglasville[4]
  • The entire concurrency with US 41/SR 3 in Marietta[4]
  • From the southern end of the I-75 concurrency, in Marietta, to the Tennessee state line[4][5]

Traffic

The Georgia Department of Transportation (GDOT) average annual daily traffic (AADT) numbers for the year 2011 show a variety of average daily traffic load numbers as the route travels across western and northern Georgia. At the route's western portion in rural Carroll County, daily vehicle load averages hover around 3,000, with a route low seen west of US 27 at just over 1,000 vehicles per day. Averages quickly rise from about 7,500 vehicles north of SR 166 to reach numbers near 22,000 around I-20, then level off between 10,000 and 15,000 between Douglasville and Austell. Vehicle loads climb again north of Austell, reaching numbers between 27,000 and 38,000 between Austell and Marietta.[3]

Once SR 5 becomes concurrent with I-575, averages increase drastically, with a route high of 93,000 vehicles seen south of Woodstock, close to I-75. Numbers generally decrease as the route travels further north, going from the mark seen in Woodstock down to 59,000 in Holly Springs, around 55,000 in Canton, and further down to 26,000 near Ball Ground. Once the freeway portion of the route ends in Pickens County, averages fall further from around 24,000 to around 12,000, but stabilize in that vicinity from Talking Rock in Pickens County all the way through Ellijay in Gilmer County to Blue Ridge in Fannin County. As SR 5 approaches its northern terminus, vehicle load decreases once more to a low of 7,200, and hovers around 9,000 as the Tennessee state line is reached.[3]

"Old Highway 5"

With the construction of I-575 and other projects between Cobb and Gilmer counties, SR 5 saw significant routing changes in the 1980s and 1990 (see History below for additional details). All of the former routing of SR 5, parallel to I-575, and the new routing in Pickens and Gilmer counties, still exists today, and is utilized by local traffic.

From the northbound exit 267A on I-75, the old routing of SR 5 follows what is today locally known as Canton Road Connector (and is signed as SR 5 Spur), which merges into Canton Road. This routing parallels I-575 very closely to its east as the old SR 5 routing heads north through the heart of Woodstock. The local road name changes to Main Street through Woodstock, and to Holly Springs Parkway on its way to Holly Springs, where it crosses under I-575 to its west at exit 14. As the old route travels through Canton, it becomes briefly concurrent with SR 140 (and is signed as SR 5 Bus.), then crosses under I-575 once more to its east again (at exit 20), and heads northeast as Ball Ground Highway. Rarely more than 0.5 miles (0.80 km) separate the old routing and I-575/SR 5/SR 515, as the old SR 5 passes through the heart of Ball Ground (where it is again signed as SR 5 Bus.), and it briefly becomes concurrent with SR 372.[1][3]

"Old Highway 5" continues north as Canton Road/Canton Highway, now somewhat further removed from the current SR 5, and travels through Nelson, then becomes concurrent with SR 53 Bus. into Jasper. North of Jasper, the former routing of SR 5 has become a minor roadway and is known as Talking Rock Road to Talking Rock, where it briefly becomes concurrent with SR 136, then heads north as Ellijay Road, having crossed to the west of the current SR 5 together with SR 136. Paralleling SR 5 very closely once more, the former routing travels through downtown Ellijay, crosses the Ellijay River, and merges into the current US 76/SR 5/SR 515 north of East Ellijay.[1][3]

History

1920s

SR 5 was established at least as early as 1919 from SR 3 in Marietta to the Tennessee state line north-northwest of Blue Ridge. SR 8 was established at this time on the path of SR 5 from Douglasville to Austell.[2] By the end of 1926, US 78 was designated on SR 8 between Douglasville and Austell. The Pickens County portion of the Canton–Jasper segment of SR 5 had a "completed hard surface". Two segments had a "completed semi hard surface": the Cherokee County portion of the Canton–Jasper segment and the southern half of the segment from Blue Ridge to the Tennessee state line. Two segments had a "sand clay or top soil": the Douglasville–Austell segment of US 78/SR 8 and the Cherokee County portion of the Marietta–Canton segment of SR 5. Two segments were under construction: the Jasper–Ellijay segment and the northern half of the Blue Ridge–Tennessee segment.[6][7] By the end of 1929, two segments had a completed hard surface: a small portion just north of the Cobb–Cherokee county line and from a point northeast of Canton to just north of the Pickens–Gilmer county line. Two segments had a completed semi hard surface: nearly the entire Gilmer County portion of the Jasper–Ellijay segment (except for the extreme southern part) and the northern half of the Blue Ridge–Tennessee segment. The Ellijay–Blue Ridge segment was under construction.[7][8]

1930s

By the middle of 1930, the southern part of the Gilmer County portion of the Jasper–Ellijay segment had a completed hard surface.[8][9] By the end of the year, the segment from Blue Ridge to the Tennessee state line also was completed. The entire Cobb County portion of the Marietta–Canton segment was under construction.[9][10] By the end of 1931, the Douglasville–Austell segment of US 78/SR 8 had a completed hard surface. Three segments of SR 5 also were completed: from Marietta to the halfway point between the Cobb–Cherokee county line and Canton, from northeast of Canton to Ellijay, and from northeast of Ellijay to Blue Ridge. The southern two-thirds of the Ellijay–Blue Ridge segment had a sand clay or top soil surface.[10][11] Between April and August 1932, a portion south of Canton had a sand clay or top soil surface. A portion northeast of Canton was under construction.[12][13] In August, the portion south of Canton was under construction.[13][14] In October, a small portion at the northern terminus was under construction.[15][16] By May 1933, the entire length of SR 5 from Marietta to Ellijay had a completed hard surface.[16][17] In May, the northern terminus had a completed semi hard surface.[17][18] In July, the entire Blue Ridge–Tennessee state line had a completed hard surface.[19][20] In the third quarter of 1935, the Ellijay–Blue Ridge segment was also completed.[21][22] By the end of the year, a portion northeast of Ellijay was under construction.[22][23] In the first quarter of 1937, SR 5 was extended southwest from Marietta to SR 6 in Powder Springs.[24][25] The next year, a portion of the extension southwest of Marietta had completed grading, but was not surfaced.[26][27] By the middle of 1939, the central portion of this extension was under construction.[27][28] In the third quarter of the year, this portion had completed grading, but was not surfaced.[28][29]

1940s

Between April and October 1940, SR 5 was established on a segment from SR 16 in Whitesburg to Douglasville. There was no indication if the two segments were connected via concurrencies with US 78/SR 8 from Douglasville to Austell and SR 6 from Austell to Powder Springs.[30][31] By the end of the year, SR 5 was extended from Whitesburg west-southwest to US 27/SR 1 in Roopville, northwest to Bowdon, south-southwest on a concurrency with SR 100, then southwest solely to the Alabama state line.[31][32] Between the beginning of 1945 and November 1946, the portion north-northeast of Bucktown and the portion from the south-southeastern part of Bowdon to the Carroll–Douglas county line were indicated to be "projected mileage". Two segments of the highway were hard surfaced: a portion south-southwest of Bowdon and the northern part of the Powder Springs–Marietta segment.[33][34] By February 1948, three segments had a sand clay or top soil surface: from the Alabama state line to a point south-southwest of Bowdon, the northern two-thirds of the McWhorter–Douglasville segment, and the southern part of the Powder Springs–Marietta segment.[34][35] By April 1949, the segment from Alabama to Roopville was shifted southward to a more direct path.[35][36]

1950s to 1970s

Between August 1950 and the beginning of 1952, the entire Powder Springs–Marietta segment had a completed hard surface. A portion north-northeast of McWhorter had a sand clay or top soil surface.[37][38] In 1953, the northern two-thirds of the McWhorter–Douglasville segment was hard surfaced. A portion east of Roopville had a sand clay or top soil surface. Three segments had completed grading, but was not surfaced: from the Alabama state line to Roopville, the Carroll County portion of the Whitesburg–McWhorter segment, and a portion north-northeast of McWhorter.[39][40] Between June 1955 and July 1957, a portion east of Roopville had completed grading, but was not surfaced.[41][42] Between July 1957 and June 1960, three segments were paved: the central portion of the Bucktown–Roopville segment, the western half of the Roopville–Whitesburg segment, and from southwest of Whitesburg to north-northeast of McWhorter.[42][43] By June 1963, the segment from west-northwest of Tyus to Roopville was paved.[43][44] By the end of 1965, the segment from the Alabama to east-southeast of Lowell was hard surfaced. The segment from east-southeast of Lowell to south-southwest of Whitesburg had a "topsoil or gravel" surface. At this time, SR 5 Byp. was built and hard surfaced from US 76/SR 5 southwest of Blue Ridge to SR 5 north of the city.[44][45] In 1966, SR 5 was hard surfaced from Alabama to Douglasville.[45][46] In 1973, SR 705 was proposed from SR 3 (Church Street) in Marietta to SR 5 south of Blackwell, with an interchange with I-75.[47][48] In 1977, I-575/SR 713 was proposed from I-75 north of Marietta to just south of the Cherokee–Pickens county line. It was completed from SR 140 south of Canton to SR 20 east of the city.[49][50] The next year, the entire Cobb County portion (except for the southern end) of I-575/SR 713 was under construction. SR 5 through Blue Ridge was shifted westward, replacing the entire length of SR 5 Byp. Its former path through the city was redesignated as SR 5 Bus.[50][51] By the end of the decade, SR 733 was proposed between two intersections with US 76/SR 5 northeast of Ellijay. At this time, SR 734 was proposed from US 76/SR 5 south-southwest of Cherry Log, across US 76/SR 5 north-northeast of Cherry Log, and then to another intersection with US 76/SR 5 in Lucius.[52][53]

1980s and 1990s

By March 1980, I-575/SR 713 was completed to SR 92 southwest of Woodstock and one exit to the south in the Canton area. SR 713 was proposed to be extended northwest to SR 5 in Talking Rock. SR 713 Spur was proposed from SR 5 to SR 713 at the northern terminus of I-575. SR 719 was proposed from SR 5 south-southwest of Ellijay to US 76/SR 5 northeast of that city.[51][54] Later that year, the southern completed part of I-575/SR 713 was extended south to I-75.[54][55] The next year, SR 5's path from south of Nelson to southeast of Talking Rock was shifted westward, replacing SR 713 Spur and the northern extension of SR 713. The former path of SR 5 was redesignated as SR 5 Alt. At this time, SR 719 was under construction.[55][56] In 1982, I-575/SR 713 was under construction from SR 92 southwest of Woodstock to south of Canton and from east of Canton to I-575's northern terminus north-northwest of Ball Ground. SR 713 was proposed to be extended northwest to SR 5 west-northwest of Talking Rock and north to the southern terminus of SR 719 at SR 5.[56][57] The next year, SR 5's path from Powder Springs to Marietta was shifted eastward, replacing SR 340. I-575/SR 713 was completed from SR 92 southwest of Woodstock to south of Canton. SR 5 in the Ellijay area was shifted eastward. US 76/SR 282 was extended southeast to East Ellijay to rejoin it. This shifting of SR 5 replaced SR 719. The former path of SR 5 was redesignated as SR 5 Alt.[57][58] In 1985, SR 5's path from Marietta to northeast of Canton was shifted westward, onto I-575. Its former path from Marietta to Lebanon was redesignated as SR 754. I-575 was completed northeast to a point southwest of Ball Ground. SR 5's path from Talking Rock to south-southwest of Ellijay was shifted westward, replacing all of SR 713.[58][59] In 1986, all of I-575 was completed. SR 5's path from northeast of Canton to north-northwest of Ball Ground was shifted westward, onto I-575. The northern part was redesignated as a northern extension of SR 372.[59][60] Between 1981 and 1986, SR 5's path in the Ball Ground–Nelson area was shifted westward, onto I-575. Part of the former path was redesignated as a northern extension of SR 372.[61][62] In 1989, SR 515 was designated on SR 5 from I-575's northern terminus west of Nelson to Blue Ridge.[63][64] Between 1984 and 1991, US 76/SR 5/SR 515 was shifted onto the path of SR 733 and SR 734, replacing them.[65][66]

Georgia designated roadways

On March 28, 1988, SR 5 was designated as "Chieftains Trail" between Canton and Ellijay.[67]

On April 28, 1999, SR 5 was designated as "C. F. 'Coote' Mason Highway" between the end of its concurrency with SR 515 and its northern terminus.[68]

In 2005, the interchange between SR 5 and SR 515 in Blue Ridge was designated as the "A. L. Stepp Interchange".[69]

Major intersections

CountyLocationmi[1]kmExitDestinationsNotes
Carroll0.0000.000
SR 48 west Wedowee
Alabama state line; southern terminus
0.4490.723
SR 100 south Franklin
West end of SR 100 concurrency
0.8911.434
SR 100 north Bowdon
East end of SR 100 concurrency
Roopville10.94017.606 US 27 / SR 1 Carrollton, Franklin
Whitesburg24.71339.772 US 27 Alt. / SR 16 (Main Street) Carrollton, NewnanTraffic circle
DouglasMcWhorter35.47557.091 SR 166 (Duncan Memorial Highway)Roundabout
Douglasville45.35572.992 I-20 (SR 402) Birmingham, AtlantaI-20 exit 34
46.74275.224

US 78 west / SR 8 west (Veterans Memorial Highway) Villa Rica
South end of US 78/SR 8 concurrency


SR 92 south (Fairburn Road) to I-20 / to Chapel Hill Road
South end of SR 92 concurrency
48.54578.126
SR 92 north (Mozley Road) Hiram, Dallas
North end of SR 92 concurrency
Lithia Springs55.82789.845

US 278 west / SR 6 (Thornton Road) to I-20 Powder Springs, Dallas
South end of US 278 concurrency
CobbAustell58.07993.469


US 78 east / SR 8 east / US 278 east (Veterans Memorial Highway) / Maxham Road Mableton
Interchange; East end of US 78/SR 8 and US 278 concurrencies
Fair Oaks66.442106.928

SR 280 south (South Cobb Drive) to I-20 / Austell Road Marietta
South end of SR 280 concurrency
67.690108.936

SR 280 north (South Cobb Drive) to I-75 Dobbins AFB
North end of SR 280 concurrency
Marietta68.810110.739

SR 120 east (South Marietta Parkway) to I-75
South end of SR 120 concurrency

SR 360 west (Powder Springs Street Southeast) Powder Springs, Confederate Cemetery
Eastern terminus of SR 360
69.274111.486
SR 120 west (Whitlock Avenue) Dallas
North end of SR 120 concurrency; south end of SR 120 Alt. concurrency
69.816112.358Cherokee Street northFormer SR 5 north




US 41 south / SR 3 south (Cobb Parkway) / SR 120 Alt. east (North Marietta Parkway) to I-75
North end of SR 120 Alt. concurrency; south end of US 41/SR 3 concurrency


US 41 north / SR 3 north (Cobb Parkway) Kennesaw, Acworth
North end of US 41/SR 3 concurrency
Church Street Marietta, SmyrnaInterchange; southbound exit and northbound entrance; former SR 5 south
71.831115.601267
I-75 south (SR 401) / Canton Highway Atlanta
South end of I-75 concurrency; SR 5 south follows exit 267B
73.148117.720268

I-75 north (SR 401) / I-575 begins (SR 417) Chattanooga
North end of I-75 concurrency; south end of I-575 concurrency; northbound exit and southbound entrance; SR 5 north follows exit 268; Northbound exit, & southbound entrance.
see I-575
Pickens104.093167.521



I-575 ends (SR 417) / SR 5 Bus. south / SR 372 south / SR 515 north Nelson, Ball Ground
Northern terminus of I-575/SR 5 Bus./SR 372; southern terminus of SR 515; north end of I-575 concurrency; south end of SR 515 concurrency; former path of SR 5; formerly proposed as SR 713 Spur; SR 5 Bus. and SR 372 northbound has no access to I-575 and SR 5 southbound.
see SR 515
FanninBlue Ridge145.084233.490


US 76 east / SR 2 east / SR 515 north / West First Street Blairsville, Downtown Blue Ridge
North end of US 76/SR 2 and SR 515 concurrencies
McCaysville155.325249.971
SR 60 south (Toccoa Avenue) Mineral Bluff, Blue Ridge

SR 68 north (Toccoa Avenue) Ducktown
Northern terminus of SR 5 and SR 60 at Tennessee state line
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Special routes

Marietta spur route (1972–1983)

State Route 5 Spur marker

State Route 5 Spur

LocationMarietta
Existed1972[70][71]–1983[72][73]

State Route 5 Spur (SR 5 Spur) was a spur route of SR 5 that existed in the central part of Marietta. In 1969, it was proposed to be established from SR 5 (Powder Springs Street) north-northwest to Polk Street.[74][75] Between 1966 and 1973, it was actually established on this proposed path.[70][71] By 1984, it was decommissioned.[72][73]

The entire route was in Marietta, Cobb County.

mikmDestinationsNotes
SR 5 (South Marietta Parkway / Waverly Way)Southern terminus
SR 120 (Whitlock Avenue)
Polk StreetNorthern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Marietta spur route

State Route 5 Spur marker

State Route 5 Spur

LocationMarietta
Length1.670 mi[1] (2.688 km)
Existed1989[76][63]–present

State Route 5 Spur (SR 5 Spur) is a 1.670-mile-long (2.688 km) spur route of SR 5 that exists mostly within the city limits of Marietta. It starts at Church Street in the north-central part of the city. It travels to the north-northeast and has a partial interchange with US 41/SR 3/SR 5 (Cobb Parkway). It curves to the northeast and has an interchange with I-75/SR 5. The freeway portion of the highway ends at an intersection with the northern terminus of Sandy Plains Road and the southern terminus of Guffin Lane. The highway curves to the north-northwest and intersects Canton Road. SR 5 Spur travels on Canton Road for about one block. Just south of Kurtz Road, it reaches its northern terminus.

The roadway that would eventually become SR 5 Spur was proposed between 1961 and 1966 as SR 705 from SR 5 southwest of Marietta to SR 5 in southern Cherokee County.[77][70] By 1973, the interchange with I-75 and a short piece of SR 705 northeast of it were built.[70][71] In 1976, SR 705 between I-75 and the northern intersection with SR 5 was built as SR 5 Conn.[78][49] In 1984, SR 5 Conn. was redesignated as SR 5 Spur. SR 5's path north of Marietta was shifted westward, onto I-75 and I-575, replacing all of SR 705.[73][79] Between 2004 and 2013, SR 5 Spur was extended to Church Street.[80][81]

The entire route is in Cobb County.

LocationmikmDestinationsNotes
MariettaChurch StreetSouthern terminus; former SR 3
US 41 / SR 3 / SR 5 (Cobb Parkway) KennesawNo access from SR 5 Spur north to Cobb Parkway or from Cobb Parkway to SR 5 Spur south

I-75 (SR 401) / SR 5 to I-575 Atlanta, Chattanooga
I-75 exit 114
Canton RoadNorthern terminus; former SR 5
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Marietta connector route

LocationMarietta
Existed1956[82][83]–1984[73][79]

State Route 5 Connector (SR 5 Conn.) was a connecting route of SR 5 that existed mostly in the north-central part of Marietta. Between 1954 and 1957, it was established from SR 3 (Church Street) in Elizabeth to US 41/SR 3E in Marietta.[82][83] In 1984, it was decommissioned.[73][79]

The entire route was in Cobb County.

LocationmikmDestinationsNotes
Elizabeth SR 3Western terminus
Marietta SR 5
US 41 / SR 3EEastern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Cobb County connector route

LocationCobb County
Existed1976[78][49]–1984[73][79]

State Route 5 Connector (SR 5 Conn.) was a connecting route of SR 5 that existed in the central part of Cobb County. Between 1961 and 1966, SR 705 was proposed from SR 5 southwest of Marietta to SR 5 in the southern part of Cherokee County.[77][70] By 1973, SR 705's interchange with Interstate 75 (I-75) and a portion of the highway northeast of it was built. The proposed northern terminus was truncated to SR 5 northeast of Marietta.[70][71] In 1976, SR 705's path from I-75 to its intersection with SR 5 northeast of Marietta was built as SR 5 Conn.[78][49] In 1984, the same year that SR 5 was shifted westward, onto I-75 and I-575, SR 5 Conn. was redesignated as SR 5 Spur.[73][79]

The entire route was in Cobb County.

LocationmikmDestinationsNotes
Marietta I-75 (SR 401)Southern terminus; I-75 exit 114
SR 5 (Canton Road)Northern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Kennesaw connector route

LocationKennesaw
Length2.092 mi[1] (3.367 km)

State Route 5 Connector (SR 5 Conn.) is a connecting route the partially exists in Kennesaw. It starts at the intersection of Barrett Parkway and US 41/SR 3 in Kennesaw, less than 1 mile (1.6 km) northwest of where the SR 5 main line crosses the same two highways. SR 5 Conn. heads northeast, locally known as Ernest W. Barrett Parkway on both sides of that intersection, and crosses Interstate 75 (I-75) just before passing by Town Center Mall. The connector terminates just east of its interchange with I-575/SR 5, where the roadway continues east as Piedmont Road.[1][3] The entire length of SR 5 Conn. is part of the National Highway System, a system of routes determined to be the most important for the nation's economy, mobility, and defense.[4]

Canton spur route

State Route 5 Spur marker

State Route 5 Spur

LocationCanton
Existed1940[84]–1953[84][85]

State Route 5 Spur (SR 5 Spur) was a spur route of SR 5 that existed in the central part of Cherokee County, mostly within the city limits of Canton. At least as early as 1940, it was established from SR 5/SR 205 south-southwest of Canton to SR 20 in the city.[84] By 1954, SR 20 was rerouted in the area, replacing all of SR 5 Spur.[84][85]

The entire route was in Cherokee County.

LocationmikmDestinationsNotes
SR 5 / SR 205Southern terminus
Canton SR 20Northern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Canton business loop

State Route 5 Business marker

State Route 5 Business

LocationCanton
Length1.750 mi[1] (2.816 km)
Existed1985[61][62]–present

State Route 5 Business (SR 5 Bus.) is a 1.750-mile-long (2.816 km) business route of SR 5 that exists in the central part of Cherokee County, entirely within the city limits of Canton. It begins at an interchange with I-575/SR 5 in the southern part of the city. At this interchange, SR 5 Bus. begins a concurrency with SR 20 and SR 140. The three highways travel to the east-northeast on a freeway. They curve to the northwest and split at Marietta Highway, with SR 5 Bus./SR 140 heading in a northerly direction. After crossing over the Etowah River, they pass Cherokee High School. After curving to the east-northeast, SR 140 splits off to the north. SR 5 Bus. passes the Riverplace Shopping Center and then intersects the northern terminus of SR 5 Conn. (Reinhardt College Parkway). It then has a second interchange with I-575/SR 5, where it reaches its northern terminus. Between 1981 and 1986, it was established on its current path.[61][62]

The entire route is in Canton, Cherokee County.

mikmDestinationsNotes


I-575 (SR 417) / SR 5 / SR 20 east / SR 140 east Atlanta, Roswell, Cumming
Southern terminus; south end of SR 20 and SR 140 concurrencies; I-575/SR 5 exit 16

SR 20 west (Marietta Highway) Cartersville, Ga National Cemetery
North end of SR 20 concurrency

SR 140 west Waleska, Reinhardt University, Funk Heritage Center
North end of SR 140 concurrency

SR 5 Conn. south (Reinhardt College Parkway)
Northern terminus of SR 5 Conn.
I-575 (SR 417) / SR 5 Atlanta, EllijayNorthern terminus; I-575/SR 5 exit 20
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Canton connector route

LocationCanton
Length1.4 mi[86] (2.3 km)
Existed2008[87][88]–present

State Route 5 Connector (SR 5 Conn.) is a 1.4-mile-long (2.3 km) connecting route of SR 5 in the central part of Canton. It is known as Reinhardt College Parkway for its entire length. It is signed as a north–south highway, but it appears to be backward, since its "southern" terminus is north of its "northern" terminus. It begins at an intersection with SR 140. It travels to the east-southeast and curves to the east-northeast. It passes by some residential neighborhoods before curving to the south-southeast. It passes the Riverstone Village shopping center. It then curves to the southeast, passing the RiverStone Medical Center. Just before its northern terminus, it travels between the Mainstreet at RiverStone and RiverStone Plaza shopping centers. It meets its northern terminus, an intersection with SR 5 Bus. (RiverStone Parkway). At least as early as 1940, an unnumbered road was built on the current path of SR 5 Conn.[84] Between 1997 and 2009, it was established.[87][88]

The entire route is in Canton, Cherokee County.

mi[86]kmDestinationsNotes
0.00.0 SR 140 Waleska, CantonSouthern terminus
1.42.3 SR 5 Bus. (RiverStone Parkway)Northern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Ball Ground business loop

State Route 5 Business marker

State Route 5 Business

LocationBall Ground
Length1.325 mi[1] (2.132 km)
Existed1990[64][89]–present

State Route 5 Business (SR 5 Bus.) is a 1.325-mile-long (2.132 km) business route of SR 5 that exists in the northeastern part of Cherokee County and the south-central part of Pickens County. Part of it is in the city limits of Ball Ground. It starts at an interchange with I-575/SR 5 in the southwestern part of Ball Ground. It travels east-southeast on Howell Bridge Road to the intersection with Ball Ground Highway and Canton Highway. Both of these roads are former portions of SR 5. There, it turns left onto Canton Highway and travels to the north-northeast. It passes Ball Ground Elementary School before beginning a concurrency with SR 372 (A.W. Roberts Drive). The two highways continue to the north-northeast and leave Ball Ground. They turn to the left, onto Appalachian Highway, and curve to the northwest. After slipping through the southwestern corner of Nelson, they reach their northern terminus, an intersection with SR 5/SR 515 at the northern terminus of I-575. The highway that eventually became SR 5 Bus. was established at least as early as 1919 as part of SR 5 from the southeastern part of Ball Ground to west of Nelson.[2] By the end of 1926, the Pickens County portion of this segment had a "completed hard surface". The Cherokee County portion had a "completed semi hard surface".[6][7] By the end of 1929, the entire aforementioned segment had a completed hard surface.[7][8] Between the beginning of 1979 and March 1980, SR 713 Spur was proposed from SR 5 south of Nelson to the proposed path of SR 713 at the proposed northern terminus of I-575 south-southwest of Nelson.[51][54] In 1981, the path of SR 5 in this area was shifted westward, replacing SR 713 Spur and the northern extension of SR 713. The former path of SR 5 was redesignated as SR 5 Alt.[55][56] In 1986, SR 5's path from Canton to south of Nelson was shifted westward, onto I-575, replacing SR 713. Part of its former path was redesignated as a northern extension of SR 372.[59][60] In 1990, SR 5 Bus. was established on its current path.[64][89]

CountyLocationmikmDestinationsNotes
CherokeeBall Ground I-575 (SR 417) / SR 5 / Howell Bridge Road westSouthern terminus; I-575/SR 5 exit 27; south end of Howell Bridge Road portion
Howell Bridge Road east / Ball Ground Highway south / Canton Highway beginsNorthern terminus of Ball Ground Highway; southern terminus of Canton Highway; northern end of Howell Bridge Road portion; southern end of Canton Highway portion; Ball Ground Highway and Canton Highway are former portions of SR 5.

SR 372 south (A.W. Roberts Drive) / Cartersville Street west
Southern end of SR 372 concurrency; eastern terminus of Cartersville Street
PickensCanton Road north / Appalachian Highway beginsSouthern end of Appalachian Highway portion; Canton Road is a former portion of SR 5 and then SR 5 Alt.; Appalachian Highway was formerly proposed as SR 713 Spur and was a former portion of SR 5.



I-575 south (SR 417) / SR 5 / SR 372 ends / SR 515 north Jasper, Ellijay
Northern terminus of I-575/SR 5 Bus./SR 372; southern terminus of SR 515; northern end of SR 372 concurrency; SR 5/SR 515 north of this intersection was formerly proposed as part of SR 713; SR 5 Bus. and SR 372 northbound has no access to I-575 and SR 5 southbound.
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Cherokee–Pickens County alternate route

State Route 5 Alternate marker

State Route 5 Alternate

LocationCherokee and Pickens counties
Existed1981[55][56]–1986[59][60]

State Route 5 Alternate (SR 5 Alt.) was an alternate route of SR 5 that existed in the northeastern part of Cherokee County and the central part of Pickens County. In 1981, the path of SR 5 from a point south of Nelson to a point southeast of Talking Rock was shifted westward. This replaced SR 713 Spur and part of SR 713. The former path of SR 5 was redesignated as SR 5 Alt.[55][56] In 1985, SR 5 replaced a little bit more of the proposed route of SR 713 west-northwest of Talking Rock. SR 5 Alt. was extended on the former path of SR 5.[58][59] In 1986, it was decommissioned.[59][60]

CountyLocationmikmDestinationsNotes
Cherokee SR 5Southern terminus
PickensTate
SR 108 south
Northern terminus of SR 108

SR 53 east
South end of SR 53 concurrency
Jasper
SR 53 west
North end of SR 53 concurrency
Talking Rock
SR 136 east
South end of SR 136 concurrency

SR 5 / SR 136 west
Northern terminus; north end of SR 136 concurrency
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Gilmer County alternate route

State Route 5 Alternate marker

State Route 5 Alternate

LocationCentral Gilmer County
Length8.3 mi[90] (13.4 km)
Existed1983[57][58]–1985[58][59]

State Route 5 Alternate (SR 5 Alt.) was a 8.3-mile-long (13.4 km) short-lived alternate route of SR 5 that existed in the central part of Gilmer County. In 1983, SR 5 in the Ellijay area was shifted eastward. US 76/SR 282 was extended southeast to East Ellijay to rejoin it. This shifting of SR 5 replaced SR 719. The former path of SR 5 was redesignated as SR 5 Alt.[57][58] In 1985, it was decommissioned. Its southern portion was redesignated as an eastern extension of SR 382.[58][59]

The entire route was in Gilmer County.

LocationmikmDestinationsNotes
SR 5Southern terminus; northern terminus of proposed SR 713

SR 382 west
Eastern terminus of SR 382
Ellijay US 76 / SR 282
SR 52

SR 5 Spur south
Northern terminus of SR 5 Spur
Chattahoochee National Forest US 76 / SR 5Northern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Ellijay spur route

State Route 5 Spur marker

State Route 5 Spur

LocationEllijay
Existed1959[91][92]–1979[52][53]

State Route 5 Spur (SR 5 Spur) was a short spur route of SR 5 that existed in the eastern part of Ellijay in the central part of Gilmer County. Between 1953 and 1960, it was established from SR 52 to US 76/SR 5.[91][92] Between 1977 and 1980, it was decommissioned.[52][53]

The entire route was in Ellijay, Gilmer County.

mikmDestinationsNotes
SR 52Southern terminus
US 76 / SR 5Northern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Blue Ridge bypass route

State Route 5 Bypass marker

State Route 5 Bypass

LocationBlue Ridge
Existed1965[44][45]–1976[93][94]

State Route 5 Bypass (SR 5 Byp.) was a bypass route of SR 5 that existed in the central part of Fannin County, mostly within the city limits of Blue Ridge. Between June 1963 and the end of 1965, it was established from US 76/SR 5 south-southwest of the city to SR 5 in the northern part of it.[44][45] Between 1974 and 1977, SR 5's path through the city was shifted westward, replacing SR 5 Byp. Part of its former path was redesignated as SR 5 Bus.[93][94]

The entire route was in Fannin County.

LocationmikmDestinationsNotes
Chattahoochee National Forest US 76 / SR 5Southern terminus
Blue Ridge SR 5Northern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Blue Ridge business loop

State Route 5 Business marker

State Route 5 Business

LocationBlue Ridge
Existed1976[93][94]–1988[76][63]

State Route 5 Business (SR 5 Bus.) was a business route of SR 5 that existed in the central part of Fannin County, mostly within the city limits of Blue Ridge. Between 1974 and 1977, SR 5's path through Blue Ridge was shifted westward, replacing all of SR 5 Byp.[93][94] In 1982, US 76 Bus. was established on the path of SR 5 Bus.[56][57] In 1988, US 76 Bus./SR 5 Bus. was decommissioned.[76][63]

The entire route was in Fannin County.

LocationmikmDestinationsNotes
Chattahoochee National Forest

US 76 / SR 2 / SR 5 / US 76 Bus. begins
Southern terminus of US 76 Bus./SR 5 Bus.; south end of US 76 Bus. concurrency
Blue Ridge

US 76 / SR 2 / SR 5 / US 76 Bus. ends
Northern terminus of US 76 Bus./SR 5 Bus.; north end of US 76 Bus. concurrency
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. "County GIS Base map shapefiles/geodatabases (varies by county)". Georgia Department of Transportation. Retrieved January 28, 2013.
  2. State Highway Department of Georgia (1920). System of State Aid Roads as Approved Representing 4800 Miles of State Aid Roads Outside the Limits of the Incorporated Towns (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  3. Geographic Transportation Reporting Analysis and Query System (GeoTRAQS) (Map). Georgia Department of Transportation. Archived from the original on December 27, 2012. Retrieved January 28, 2013.
  4. National Highway System: Atlanta, GA (PDF) (Map). Federal Highway Administration. May 9, 2019. Retrieved August 19, 2019.
  5. National Highway System: Georgia (PDF) (Map). Federal Highway Administration. May 8, 2019. Retrieved August 17, 2019.
  6. State Highway Department of Georgia (1921). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  7. State Highway Department of Georgia (October 1926). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  8. State Highway Department of Georgia (October 1929). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  9. State Highway Department of Georgia (June 1930). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  10. State Highway Department of Georgia (November 1930). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  11. State Highway Department of Georgia (January 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  12. State Highway Department of Georgia (May 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  13. State Highway Department of Georgia (August 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  14. State Highway Department of Georgia (September 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  15. State Highway Department of Georgia (October 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  16. State Highway Department of Georgia (November 1932). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  17. State Highway Department of Georgia (May 1933). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  18. State Highway Department of Georgia (June 1933). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  19. State Highway Department of Georgia (July 1933). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  20. State Highway Department of Georgia (August 1933). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  21. State Highway Department of Georgia (July 1, 1935). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  22. State Highway Department of Georgia (October 1, 1935). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  23. State Highway Department of Georgia (January 1, 1936). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  24. State Highway Department of Georgia (January 1, 1937). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  25. State Highway Department of Georgia (April 1, 1937). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  26. Georgia State Highway Board (January 1, 1938). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017.
  27. State Highway Department of Georgia (September 1, 1938). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017.
  28. State Highway Department of Georgia (July 1, 1939). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017.
  29. State Highway Department of Georgia (October 1, 1939). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017.
  30. State Highway Department of Georgia (April 1, 1940). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017.
  31. State Highway Department of Georgia (October 1, 1940). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017.
  32. State Highway Department of Georgia (January 1, 1941). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017.
  33. State Highway Department of Georgia (January 1, 1945). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017.
  34. State Highway Department of Georgia (1946). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017. (Corrected to November 7, 1946.)
  35. State Highway Department of Georgia (1948). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017. (Corrected to February 28, 1948.)
  36. State Highway Department of Georgia (1949). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017. (Corrected to April 1, 1949.)
  37. State Highway Department of Georgia (1950). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017. (Corrected to August 1, 1950.)
  38. State Highway Department of Georgia (1952). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017. (Corrected to January 1, 1952.)
  39. State Highway Department of Georgia (January 1, 1953). System of State Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017. (Corrected to January 1, 1953.)
  40. State Highway Department of Georgia (1953). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017. (Corrected to September 1, 1953.)
  41. State Highway Department of Georgia (1955). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017. (Corrected to June 1, 1955.)
  42. State Highway Department of Georgia (1957). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017. (Corrected to July 1, 1957.)
  43. State Highway Department of Georgia (1960). State Highway System and Other Principal Connecting Roads (PDF) (Map) (1960–1961 ed.). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017. (Corrected to June 1, 1960.)
  44. State Highway Department of Georgia (1963). State Highway System and Other Principal Connecting Roads (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. OCLC 5673161. Retrieved May 8, 2017. (Corrected to June 1, 1963.)
  45. State Highway Department of Georgia (January 1966). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  46. State Highway Department of Georgia (January 1967). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  47. Georgia Department of Transportation (January 1973). Official Highway Map (PDF) (Map). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  48. Georgia Department of Transportation (January 1974). Official Highway Map (PDF) (Map) (1974–1975 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  49. Georgia Department of Transportation (January 1977). Official Highway Map (PDF) (Map) (1977–1978 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  50. Georgia Department of Transportation (January 1977). Official Highway Map (PDF) (Map) (1977–1978 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  51. Georgia Department of Transportation (January 1978). Official Highway Map (PDF) (Map) (1978-79 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  52. Georgia Department of Transportation (1977). General Highway Map: Gilmer County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  53. Georgia Department of Transportation (1980). General Highway Map: Gilmer County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  54. Georgia Department of Transportation (1980). Official Highway and Transportation Map (PDF) (Map) (1980–1981 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  55. Georgia Department of Transportation (1981). Official Highway and Transportation Map (PDF) (Map) (1981–1982 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  56. Georgia Department of Transportation (1982). Official Highway and Transportation Map (PDF) (Map). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  57. Georgia Department of Transportation (1983). Official Highway and Transportation Map (PDF) (Map) (1983–1984 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  58. Georgia Department of Transportation (1984). Official Highway and Transportation Map (PDF) (Map) (1984–1985 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  59. Georgia Department of Transportation (1986). Official Highway and Transportation Map (PDF) (Map) (1986–1987 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  60. Georgia Department of Transportation (1987). Official Highway and Transportation Map (PDF) (Map) (1987–1988 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  61. Georgia Department of Transportation (1981). General Highway Map: Cherokee County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  62. Georgia Department of Transportation (1986). General Highway Map: Cherokee County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  63. Georgia Department of Transportation (1989). Official Highway and Transportation Map (PDF) (Map) (1989–1990 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 9, 2017.
  64. Georgia Department of Transportation (1990). Official Highway and Transportation Map (PDF) (Map) (1990–1991 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 9, 2017.
  65. Georgia Department of Transportation (1984). General Highway Map: Gilmer County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  66. Georgia Department of Transportation (1991). General Highway Map: Gilmer County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  67. General Assembly of the State of Georgia (1988). "Chieftains Trail—Designated" (PDF). Acts and Resolutions of the General Assembly of the State of Georgia. Georgia Department of Transportation. p. 335. Retrieved November 16, 2012.
  68. General Assembly of the State of Georgia (1999). "C. F. 'Coote' Mason Highway—Designated" (PDF). Acts and Resolutions of the General Assembly of the State of Georgia. Georgia Department of Transportation. vol. 1, p. 916. Retrieved November 16, 2012.
  69. General Assembly of the State of Georgia. "A Resolution Designating the A. L. Stepp Interchange; and for other purposes" (PDF). Acts and Resolutions of the General Assembly of the State of Georgia. Georgia Department of Transportation. Retrieved November 16, 2012.
  70. Georgia Department of Transportation (1966). General Highway Map: Cobb County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  71. Georgia Department of Transportation (1973). General Highway Map: Cobb County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  72. Georgia Department of Transportation (1977). General Highway Map: Cobb County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  73. Georgia Department of Transportation (1984). General Highway Map: Cobb County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  74. State Highway Department of Georgia (January 1969). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  75. State Highway Department of Georgia (January 1970). Official Highway Map (PDF) (Map). Scale not given. Atlanta: State Highway Department of Georgia. Retrieved May 8, 2017.
  76. Georgia Department of Transportation (1988). Official Highway and Transportation Map (PDF) (Map) (1988–1989 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 9, 2017.
  77. Georgia Department of Transportation (1961). General Highway Map: Cobb County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  78. Georgia Department of Transportation (January 1976). Official Highway Map (PDF) (Map) (1976–1977 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 8, 2017.
  79. Georgia Department of Transportation (1985). General Highway Map: Cobb County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  80. Georgia Department of Transportation (2004). General Highway Map: Cobb County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  81. Georgia Department of Transportation (2013). General Highway Map: Cobb County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  82. Georgia Department of Transportation (1954). General Highway Map: Cobb County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  83. Georgia Department of Transportation (1957). General Highway Map: Cobb County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  84. Georgia Department of Transportation (1940). General Highway Map: Cherokee County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  85. Georgia Department of Transportation (1954). General Highway Map: Cherokee County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  86. Google (March 2, 2017). "Overview map of SR 5 Conn" (Map). Google Maps. Google. Retrieved March 2, 2017.
  87. Georgia Department of Transportation (1997). General Highway Map: Cherokee County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  88. Georgia Department of Transportation (2009). General Highway Map: Cherokee County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  89. Georgia Department of Transportation (1991). Official Highway and Transportation Map (PDF) (Map) (1991–1992 ed.). Scale not given. Atlanta: Georgia Department of Transportation. Retrieved May 9, 2017.
  90. Google (September 15, 2013). "Overview map of SR 5 Alt" (Map). Google Maps. Google. Retrieved September 15, 2013.
  91. Georgia Department of Transportation (1953). General Highway Map: Gilmer County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  92. Georgia Department of Transportation (1960). General Highway Map: Gilmer County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  93. Georgia Department of Transportation (1974). General Highway Map: Fannin County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
  94. Georgia Department of Transportation (1977). General Highway Map: Fannin County, Georgia (Map). Atlanta: Georgia Department of Transportation via GDOT Maps.
Template:Attached KML/Georgia State Route 5
KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.