DND–KMP Expressway

DND–Faridabad–KMP Expressway (NH-148NA) is an under-construction 59 km long, 6-lane wide access-controlled expressway in Delhi NCR, India.[1] It will connect the junction of DND Flyway and Ring Road at Maharani Bagh in Delhi with KMP Expressway at Khalilpur, Nuh district (near Sohna) in Haryana. Initially it was a separate expressway, but now it is a part of Delhi–Mumbai Expressway project. This expressway will have an additional 31 km long spur link from Sector-65, Faridabad bypass to Jewar Airport.[2]

DND–KMP Expressway (NH-148NA)
DND KMP Exp.jpg
Route information
Maintained by National Highways Authority of India (NHAI)
Length59 km (37 mi)
ExistedJanuary 2024 (expected)–present
Major junctions
North endDND Flyway, Maharani Bagh, Delhi
South endKMP Expressway, Khalilpur, Nuh district, Haryana
Location
CountryIndia
StatesDelhi and Haryana
Major citiesNew Delhi, Noida, Faridabad, Ballabgarh, Sohna & Jewar
Highway system

In Haryana, it will pass entirely through existing Faridabad bypass road. The HSVP has transferred the Faridabad bypass to NHAI for the construction of Delhi–Mumbai Expressway project.

Route

This highway shall connect Sarai Kale Khan (Delhi), Noida, Jewar, Faridabad and Ballabhgarh to the main alignment of Delhi-Mumbai Expressway via an interchange at Khalilpur (Nuh district).[3][4]

NCT of Delhi (12 km)

Haryana (47 km)

KMP interchange

After reaching KMP interchange at Khalilpur, traffic coming from Maharani Bagh (Delhi) and Faridabad bypass has 2 options:

1. They can turn south towards Dausa and Mumbai, or turn north towards Gurgaon and Sohna.

2. They can also use KMP Expressway and turn east for Palwal and turn west for Manesar.

Construction

The construction work of the 'DND–Faridabad–KMP' section was awarded by the National Highways Authority of India (NHAI) to Dineshchandra R. Agrawal Infracon Private Limited (DRA Infracon) in August 2020.[6] This project will reduce congestion on Ashram to Ballabhgarh route (via Badarpur). In Haryana it will have multiple Flyovers and a 3-lane service road on either side of Faridabad bypass road.

7 km out of 9 km route of Package-1 in Delhi state will be elevated with two-level crossings at 4 locations of the Delhi Metro rail line (near Okhla Vihar and Kalindi Kunj metro station), making it the 1st expressway in India to cross above elevated metro rail line. It Exits Delhi near MCD Toll tax (near Mithapur in Delhi) which is 12.5 km from the DND starting point.

Packages

The NHAI has divided the construction work of 59 km long DND–Faridabad–KMP section of Delhi–Mumbai Expressway project into three packages and awarded it to DRA Infracon. Its construction cost is around 5,332 crores (including land acquisition cost).[7][8]

Route map of DND-KMP Expressway (in Red colour)
Sr No Package Length in km Value in crores State
1. Junction of DND Flyway & Ring Road in Delhi to Jaitpur–Pushta road in Delhi 09 1,881 Delhi
2. Jaitpur–Pushta road in Delhi to Sector-62/65 dividing road in Faridabad 24 1,832 Delhi & Haryana
3. Sector-62/65 dividing road in Faridabad to KMP Expressway at Khalilpur in Nuh district 26 1,619 Haryana

Note: Package-2 starts at junction of Jaitpur–Pushta road and Kalindi KunjMithapur road in Delhi (near NTPC Eco Park, Badarpur).

Delhi–Mumbai Expressway

The construction work of Delhi–Mumbai Expressway is divided by NHAI into 4 sections with a total of 52 tenders/ construction packages as given below. The entire 1,350 km long expressway is expected to be completed by January 2024.

Section Length in km No. of packages State-wise packages
DNDFaridabadKMP 59 03 1 in Delhi and 2 in Haryana
SohnaKMPVadodara 844 31 3 in Haryana, 13 in Rajasthan, 9 in Madhya Pradesh and 6 in Gujarat
VadodaraVirar 354 13 10 in Gujarat and 3 in Maharashtra
VirarJNPT 92 05 5 in Maharashtra

The NHAI had announced in August 2021, that an additional 31 km long spur will also be constructed from Noida International Airport in Jewar to Faridabad bypass road on this expressway.[9] Tender for this Spur package has been awarded by the NHAI to Apco Infratech Pvt. Ltd. on 29 July 2022.

Spur Package Length in km Value in crores State
Faridabad bypass (Sector 65), via interchange with EPE at Mohna, to Yamuna Expressway at Dayanat Pur village, north of Jewar 31 1,660 Haryana and UP

Status updates

  • Mar 2019: Foundation stone laid by Union Minister Nitin Gadkari on 1 March 2019 in Mithapur, Delhi.[10]
  • Dec 2019: NHAI invited bids for construction in 3 packages under Bharatmala Pariyojana.[11]
  • July 2020: Work awarded by NHAI to DRA Infracon Private Limited (Package-1 & Package-2).[8]
  • Aug 2020: Work awarded by NHAI to DRA Infracon Private Limited (Package-3).
  • Oct 2020: Soil testing work started in Faridabad district of Haryana[12]
  • Feb 2021: Construction work is expected to start this year: NHAI.[13]
  • May 2021: Construction work started in Package-3 on 14 May 2021. Schedule completion is 24 months from the start of construction.
  • Aug 2021: Construction work started in Package-2 (Faridabad bypass) on 10 August.
  • Oct 2021: HSVP started demolishing illegal encroachments falling on the RoW in Faridabad.[14]
  • Jan 2022: Construction work started in Package-1 (Delhi) on 11 January.
  • Mar 2022: Segment Launcher started erection of concrete structures in Maharani Bagh on 21 March. 7 km out of 9 km long (Package-1) is elevated.[15]
  • July 2022: Tender for Faridabad bypass to Jewar Airport (Spur package) has been awarded by the NHAI to Apco Infratech Pvt. Ltd. on 29 July.[16][17]
  • Feb 2023: The NHAI is planning to open 20 km stretch on Package-3, from Kail Gaon on NH-2 to KMP interchange at Khalilpur (Nuh district).[18]

See also

References

  1. "59-km six-lane road to connect DND, Ring Road with Delhi-Mumbai expressway - delhi news". Hindustan Times. Retrieved 4 August 2020.
  2. "Delhi-Mumbai Expressway will be linked to Jewar Airport". Times of India. 8 July 2022.
  3. "Jewar Airport और Delhi-Mumbai एक्‍सप्रेसवे से लिंक रहेगा DND-Faridabad-KMP Expressway, रूट मैप देखिए". Navbharat Times. 25 March 2023.
  4. "DND-Faridabad-KMP Expressway to be connected with Delhi-Mumbai Expressway, Jewar Airport, check routes". DNA India. 27 March 2023.
  5. "दिल्ली-मुंबई एक्सप्रेस-वे पर हरियाणा के फरीदाबाद से आ रही खुशखबरी, जानें फायदा". Dainik Jagran. 8 April 2022.
  6. "Work awarded for new Delhi-Mumbai e-way link". Times of India.
  7. "Delhi NCR: Six-lane highway to connect ring road-DND junction with Delhi-Mumbai Expressway". Times Now. Retrieved 4 August 2020.
  8. "Contract award status of Delhi–Mumbai Expressway as of May 2021" (PDF). NHAI. 28 May 2021.
  9. "Jewar International Airport will be linked to Delhi-Mumbai Expressway". News18. 16 September 2021.
  10. "Nitin Gadkari to lay foundation stone for Rs 3,580 crore project to decongest Delhi". Economic Times.
  11. "NHAI invites bids for highways under Bharatmala Pariyojana". Construction Week Online. 22 December 2019.
  12. "Soil testing for Delhi-Mumbai Expressway link begins in Faridabad". Times of India.
  13. "NHAI to start work on crucial decongestion projects in Delhi this year". Hindustan Times. 10 February 2021.
  14. "NHAI to raze 500 structures for Delhi-Mumbai Expressway". The Tribune. 9 October 2021.
  15. "दिल्ली-मुम्बई एक्सप्रेसवे के पहले चरण का निर्माण शुरू, नोएडा से बनकर जा रहा प्री-कास्ट मैटेरियल". TriCity Today. 22 March 2022.
  16. "Tender opens for Expressway to link Faridabad & Jewar Airport". The Tribune. 31 July 2022.
  17. "Noida Airport: 2 साल में दिल्ली-मुंबई एक्सप्रेसवे से जुड़ेगा जेवर एयरपोर्ट, 6 लेन पर खर्च होंगे 16.60 अरब, NHAI ने निकाला टेंडर". Navbharat Times. 31 July 2022.
  18. "Ballabhgarh: Delhi-MumbaiExpressway link opens this week". The Times of India. 20 February 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.