Crystal Lake Wind Farm is an electricity generating wind farm facility in Winnebago and Hancock County, Iowa, United States. It is owned by a subsidiary of Florida-based Next Era and began operations in 2008. With the completion of phase 3 of the project it has a generating capacity of 416 megawatts .[1] It is located roughly five miles from Britt, Iowa, and is on the edge of Crystal Lake, which the wind farm is named after.
Crystal Lake Wind Farm | |
---|---|
Country | United States |
Location | Crystal Lake, Iowa |
Coordinates | 43°13′45″N 93°50′28″W |
Status | Operational |
Owner(s) | Next Era |
Power generation | |
Nameplate capacity | 416 MW |
References
- "Crystal Lake I, II & III Wind Energy Center" (PDF). NextEra Energy Resources. 2011. Retrieved 2011-04-16.